Electric power engineering project investment management system

A management system and power engineering technology, applied in the direction of resources, data processing applications, instruments, etc., can solve the problems of large amount of investment data and information, complex types, and large investment in power generation project construction, so as to control investment risks and improve value. The effect of density

Inactive Publication Date: 2019-05-21
中国大唐集团科学技术研究总院有限公司
View PDF2 Cites 53 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The construction of power generation projects requires large investment, intensive technology, and long construction period. The investment data and information are large in volume, complex in types, and numerous in layers. At present, the forms, project codes, and The name and content are not unified and standardized, which makes data capture difficult and inefficient

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Electric power engineering project investment management system
  • Electric power engineering project investment management system
  • Electric power engineering project investment management system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0026] In the power engineering project investment management system of this embodiment, the standard module of the management system includes a standard file unit, which is used to maintain standard files and policies and regulations used in all projects. The standard files are divided into: national standards, industry norms, and group company systems;

[0027] The standard module of the management system also includes a professional quota library unit, and the data sources are "Estimated Budget Quotas for Electric Power Construction Projects" and "Budget Quotas for Electric Power Construction Projects" (2013 edition), including quota labor, materials, and mechanical unit consumption data per shift. Provides functions such as project quota query, investment data analysis, call of corresponding quota and establishment of project supplementary quota.

[0028] The standard module of the management system also includes a project investment management template unit, which provides...

Embodiment 2

[0045] In the power engineering project investment management system of this embodiment, on the basis of Embodiment 1, the project investment management module includes this project information unit, wherein:

[0046] The basic information of the project is used to maintain the basic information of the current operating project, including project number, project company, start date, completion date, construction status, project size, power generation type, engineering quantity version, estimated version, project description, relevant consultants, etc.;

[0047] Project tender information is used to set project-related tender information, including tender serial number, tender name, contract number, etc.;

[0048] Project-related files are used to maintain relevant management files of the current operating project, including file classification, file name, editor, upload time, etc., and can be downloaded, previewed, and deleted;

[0049] Project image progress is used to mainta...

Embodiment 3

[0085]In the power engineering project investment management system of this embodiment, on the basis of Embodiments 1 and 2, the report center module applies the standard template of the management system, integrates the data of each business module in the system, and performs various stages, Comparative analysis of various elements, confirmation of risk factors and costs, and dynamic control of investment. The report center includes 11 single reports such as project estimates, contract ledgers, project quantities, progress payments, contract settlements, fund plans and completion, financial statements, material storage, etc.; and a comparison between feasibility study estimates and design estimates 6 types of comparison report generation units, including design budget estimate and execution estimate, execution estimate and total settlement, total settlement and cost benchmarking, cost dynamic tracking, and comparison of economic indicators during the construction period of eac...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to an electric power engineering project investment management system, and belongs to the technical field of informatization and consists of a DMS framework platform layer, a basic data layer, a business application layer and a statistical analysis layer. The system comprises a management system standard module for storing professional files related to project investment andproviding basic information support; a project investment management module used for storing project information, data information of each stage of a project and related files and carrying out all-around and all-factor tracking control on engineering construction; a report center module, covering various engineering project investment reports; and a system management module used for basic settingand daily maintenance of the system. The system controls, analyzes, tracks and guides data information of the whole process of engineering construction, realizes resource sharing, promotes standardized construction, refined management and large-scale development of engineering projects, improves the working efficiency and quality, and provides effective technical support for realizing benefit maximization of the whole life cycle of the projects and enhancing the core competitiveness of enterprises.

Description

technical field [0001] The invention specifically relates to a power engineering project investment management system. Background technique [0002] Project management is a sub-discipline of management. The definition of project management refers to the use of specialized knowledge, skills, tools and methods in project activities to enable the project to achieve or exceed the set requirements and expectations under the limited conditions of limited resources. process. [0003] The construction of power generation projects requires large investment, intensive technology, and long construction period. The investment data information is large in volume, complex in types, and numerous in layers. At present, the forms of production factors, project codes, and The name and content are not uniform and standardized, which makes data capture difficult and inefficient. Therefore, it is very important to provide systematically advanced, standardized and applicable management methods ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q50/06
Inventor 王洪玲吴凤洁聂永喻涛陈正浩孟金林程绍武姜东红武玉刘端媚李进学王建平
Owner 中国大唐集团科学技术研究总院有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products