Engineering project management system based on engineering list

A technology for engineering projects and management systems, applied in the field of engineering project management, can solve problems such as inability to grasp employee work information in real time, inability to accurately schedule employees, and delay in construction schedules, so as to facilitate overall arrangements, promote completion, and improve operational efficiency. Effect

Pending Publication Date: 2019-07-02
ANHUI UNIV OF SCI & TECH
View PDF6 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The present invention is mainly used to solve the problem that the existing project management cannot grasp the employee's work infor

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Engineering project management system based on engineering list
  • Engineering project management system based on engineering list
  • Engineering project management system based on engineering list

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0019] use Figure 1-Figure 3 An engineering project management system based on an engineering list according to an embodiment of the present invention is described as follows.

[0020] Such as figure 1 As shown, the engineering project management system based on the project list of the present invention is characterized in that it includes a personnel scheduling module, a task information module, a personnel recruitment module, a construction period decision module, an improvement module and a health and safety module; The personnel scheduling module is used to perform personnel scheduling according to the decisions made by the task information module and the construction period decision module; the task information module is used to issue task information in advance, and the personnel scheduling module matches and schedules target groups; the personnel recruitment module uses It is used to recruit temporary workers; the duration decision module is used to specify the task d...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention belongs to the field of engineering project management, and particularly relates to an engineering project management system based on an engineering list, which comprises a personnel scheduling module, a task information module, a personnel recruitment module, a construction period decision module, an improvement module and a health safety module, the personnel scheduling module comprises a classification unit, a grade unit, a numbering unit, a personnel information unit, an identity unit and a quick search unit; the classification unit is used for classifying personnel accordingto types of work; the grading unit is used for dividing the personnel according to grades in the work types; the numbering unit is used for numbering personnel; the personnel information unit is usedfor storing specific information of personnel; the identity unit is used for verifying the identity of a person; the method is mainly used for solving the problems that existing engineering management cannot master working information of employees in real time, the employees cannot be accurately dispatched for distribution, and the construction period is delayed due to weather reasons.

Description

technical field [0001] The invention belongs to the field of engineering project management, in particular to an engineering project management system based on engineering list. Background technique [0002] Engineering project management means that the enterprise engaged in engineering project management is entrusted by the owner, and according to the contract, represents the owner to carry out the management and service of the whole process or several stages of the organization and implementation of the engineering project. The engineering project management company does not directly sign contracts with the general contractor of the project or the survey, design, supply, construction and other enterprises, but can assist the owner and the general contractor of the project or the survey, design, supply, etc. according to the contract , Construction and other enterprises sign contracts, and are entrusted by the owner to supervise the performance of the contract. [0003] Th...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06Q10/10
CPCG06Q10/103
Inventor 王思颖张猛
Owner ANHUI UNIV OF SCI & TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products