Arch dam pouring block construction control method

A control method and block control technology, applied in arch dams, dams, special data processing applications, etc., can solve problems such as large workload, time-consuming, and complex analytical relationships, and achieve the effect of improving construction efficiency and ensuring construction accuracy.
CN110284465AInactive Publication Date: 2019-09-27POWERCHINA CHENGDU ENG

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
POWERCHINA CHENGDU ENG
Publication Date
2019-09-27
Estimated Expiration
Not applicable · inactive patent

Smart Images

  • Figure 1
    Figure 1
  • Figure 2
    Figure 2
  • Figure 3
    Figure 3
Patent Text Reader

Abstract

The invention relates to an arch dam construction control method, and belongs to the field of water conservancy and hydropower, in particular to an arch dam pouring block construction control method. According to the technical problems, the arch dam pouring block construction control method can fast and accurately determine space parameters of arch dam pouring blocks, so that arch dam structural construction is completed. The arch dam pouring block construction control method comprises the following steps that a, firstly arch dam shape parameter curve fitting is carried out; b, secondly, arch dam shape coordinate calculation is carried out; c, a coordinate formula of an intersection of a lead straight surface and upstream surface and downstream surface of an arch ring is established; d, the lowest point coordinates of the upstream surface of the lead straight surface after corner cut of the upstream surface are calculated; and e, finally by using the parameters obtained through the steps, the parameters are converted to a CAD graph through a DXF file, a plane graph, a radial profile graph and an arch dam three-dimensional shape graph of arch dam pouring block points are obtained, and construction operation is carried out through obtained structural information. The arch dam pouring block construction control method is especially suitable for water and electricity large dam arch dam pouring block construction.
Need to check novelty before this filing date? Find Prior Art

Description

technical field

[0001] The invention relates to an arch dam construction control method in the field of water conservancy and hydropower, in particular to a construction control method for arch dam pouring blocks. Background technique

[0002] The rich dam-building experience accumulated by the predecessors and the development of science and technology have made the arch dam line shape more and more diverse. The parabolic arch has been widely used in my country in recent years because of its characteristics such as easy selection of parameters, strong ability to adapt to river valleys, and good stress conditions. The Xiluodu project under construction also uses the parabolic arch as the recommended dam shape.

[0003] The basic method of arch dam shape design is to first determine the control elevation, draw up the arch crown section and the geometric shape of the control arch ring according to the terrain, geological conditions and hub layout of the dam site, and then deter...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More