Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Arch dam pouring block construction control method

A control method and block control technology, applied in arch dams, dams, special data processing applications, etc., can solve problems such as large workload, time-consuming, and complex analytical relationships, and achieve the effect of improving construction efficiency and ensuring construction accuracy.

Inactive Publication Date: 2019-09-27
POWERCHINA CHENGDU ENG
View PDF2 Cites 6 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The space analysis relationship of the parabolic hyperbolic arch dam is complicated, and the spatial coordinates of the arch dam pouring blocks cannot be calculated by simple linear interpolation
The traditional method is to calculate by hand, the workload is heavy and time-consuming

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Arch dam pouring block construction control method
  • Arch dam pouring block construction control method
  • Arch dam pouring block construction control method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0056] The arch dam pouring block masonry method comprises the following steps: a, first carry out arch dam shape parameter curve fitting, wherein the control parameters of the arch crown beam section are the upstream dam surface curve of the arch crown beam and the thickness Tc of the arch crown beam, the horizontal arch The control parameters of the ring are the X and Y coordinates of the arch end, the curvature radius R of the arch ring and the central angle:

[0057] (1) Parameter fitting of arch crown beam:

[0058] The curve of the upstream dam surface of the crown beam and the thickness Tc of the crown beam at any point along the elevation are fitted by cubic curve interpolation, and the fitting formula is:

[0059] T c (z)=t 0 +t 1 *z+t 2 *z 2 +t 3 *z 3

[0060] A u (z)=a 0 +a 1 *z+a 2 *z 2 +a 3 *z 3

[0061] In the formula, A u (z) - the distance from the upstream surface point of each calculated elevation arch crown section to the dam axis;

[0062]...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to an arch dam construction control method, and belongs to the field of water conservancy and hydropower, in particular to an arch dam pouring block construction control method. According to the technical problems, the arch dam pouring block construction control method can fast and accurately determine space parameters of arch dam pouring blocks, so that arch dam structural construction is completed. The arch dam pouring block construction control method comprises the following steps that a, firstly arch dam shape parameter curve fitting is carried out; b, secondly, arch dam shape coordinate calculation is carried out; c, a coordinate formula of an intersection of a lead straight surface and upstream surface and downstream surface of an arch ring is established; d, the lowest point coordinates of the upstream surface of the lead straight surface after corner cut of the upstream surface are calculated; and e, finally by using the parameters obtained through the steps, the parameters are converted to a CAD graph through a DXF file, a plane graph, a radial profile graph and an arch dam three-dimensional shape graph of arch dam pouring block points are obtained, and construction operation is carried out through obtained structural information. The arch dam pouring block construction control method is especially suitable for water and electricity large dam arch dam pouring block construction.

Description

technical field [0001] The invention relates to an arch dam construction control method in the field of water conservancy and hydropower, in particular to a construction control method for arch dam pouring blocks. Background technique [0002] The rich dam-building experience accumulated by the predecessors and the development of science and technology have made the arch dam line shape more and more diverse. The parabolic arch has been widely used in my country in recent years because of its characteristics such as easy selection of parameters, strong ability to adapt to river valleys, and good stress conditions. The Xiluodu project under construction also uses the parabolic arch as the recommended dam shape. [0003] The basic method of arch dam shape design is to first determine the control elevation, draw up the arch crown section and the geometric shape of the control arch ring according to the terrain, geological conditions and hub layout of the dam site, and then deter...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E02B7/12G06F17/50
CPCE02B7/12G06F30/13
Inventor 赵艳牟高翔张敬陈丽萍唐忠敏
Owner POWERCHINA CHENGDU ENG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products