A construction method and steel truss technology, applied in the processing of building materials, construction, building structure, etc., can solve the problems of difficult safe operation, large amount of construction measures, and labor-intensive, etc., to achieve simple and easy operation, solve problems Interface cracks, cleverly conceived effects
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0030] The present invention will be further explained below in conjunction with the accompanying drawings and specific embodiments. It should be understood that the following specific embodiments are only used to illustrate the present invention and are not intended to limit the scope of the present invention. It should be noted that the words "front", "rear", "left", "right", "upper" and "lower" used in the following description refer to the directions in the drawings, and the words "inner" and "outer ” refer to directions towards or away from the geometric center of a particular part, respectively.
[0031] As shown in the figure, the external tension preloading construction method of the large-span transition steel truss according to the present invention includes the following steps:
[0032] 1. When the conversion steel truss 11 is assembled in sections at high altitude, a steel pipe support tire frame 1 is erected on its lower string;
[0033] 2. Insert the bottom of t...