An Alignment Early Warning Method for Shield Tunnel
A technology of shield tunneling and alignment, applied in tunnels, tunnel linings, earthwork drilling and mining, etc., can solve problems such as data errors, untimely and efficient axis deviation status, input data errors, etc., and achieve simple steps, timely and efficient early warning, and high precision high effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0044] Such as figure 1 Shown, a kind of shield tunnel alignment early warning method of the present invention comprises the following steps:
[0045] Step 1. According to the formula Calculate the actual cumulative rotation angle β of the current segment ring I I , where β′ I is the actual rotation angle between the axis of the current segment ring I and the axis of the previous segment ring, β′ i Be the actual rotation angle between the axis of the front i ring segment of the current segment ring I and the axis of the front i+1 ring segment of the current segment ring I, i and I are integers, is the actual half-wedge shape of the current segment ring I, is the actual semi-wedge shape of the front i-ring segment of the current segment ring I, and R is the segment radius;
[0046] It should be noted that the actual cumulative rotation angle of the current segment ring is obtained by calculating the included angle between the axes of two adjacent two-ring segments and a...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com