Tunnel ditch builder's staging

A ditch and tunnel technology, applied in tunnels, tunnel lining, drainage, etc., can solve the problems of time-consuming handling and disassembly, large manpower consumption, and easy-to-bend gutters, so as to improve handling efficiency, increase efficiency, and reduce unevenness deformation effect

Active Publication Date: 2020-09-18
中铁隧道局集团建设有限公司
View PDF7 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Because the boards are long and heavy, it takes up to 5-7 people to carry and disassemble them, which consumes a lot of manpower; at the same time, the handling and disassembly of the boards is very time-consuming, and it takes about two days to complete a construction cycle, that is, 30 In addition, the existing slabs are made too thin in order to reduce weight and facilitate transportation, and the too thin slabs are easy to bend when pouring cement, resulting in uneven gutters or uneven widths

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Tunnel ditch builder's staging
  • Tunnel ditch builder's staging
  • Tunnel ditch builder's staging

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0034] The present invention will be further described in detail below in conjunction with the accompanying drawings, so that those skilled in the art can implement it with reference to the description.

[0035] Such as figure 1 As shown, when constructing in the tunnel 1, it is necessary to put the left plate and the right plate into the ditch 2, and then pour cement into the gap 3 between the left plate and the right plate and the ditch wall, and remove it after setting The ditch of the target specification is obtained only by the left plate and the right plate.

[0036] For better construction, such as figure 1 , 2 , 3, 4 and 5, a tunnel ditch construction platform, including:

[0037] A support frame 5 that can move in the tunnel, the support frame includes left and right support rods (8, 9) and crossbeams 7 horizontally erected on the left and right support rods, and the lower ends of the left and right support rods (8, 9) are provided with The wheels 10 move in the t...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a tunnel ditch builder's staging. The tunnel ditch builder's staging comprises a support frame that moves along the extension direction of a tunnel ditch, the support frame spans the ditch and a cross beam of the support frame is provided with a notch; and a model composed of a left plate and a right plate, wherein the left plate and the right plate are respectively hung under the cross beam through a regulating part, and the regulating part passes through the notch and can move left and right along the notch to adjust the relative distance between the left plate and the right plate. According to the tunnel ditch builder's staging provided by the invention, the support frame enables the left plate and the right plate to be carried and moved more easily, and meanwhile, the distance between the left plate and the right plate is more easily adjusted, so that the left plate and the right plate form a model consistent with the preset ditch width, an rapid construction of the model is more conducive to pouring outside the model in the later stage, thereby improving the efficiency of ditch pouring and reducing manpower consumption.

Description

technical field [0001] The invention relates to the technical field of tunnel construction equipment, and more specifically, the invention relates to a tunnel ditch construction stand. Background technique [0002] During the construction of the tunnel, a trench will be left after the bottom of the tunnel is poured with cement. The trench needs to be poured again to obtain a ditch with a suitable size. The ditch can be used for wiring or drainage. The existing construction The method is to use two slabs of about 30 meters to place in the ditch. The slabs are vertical to build a model of the gutter, and then pour cement on both sides of the slab. After the cement hardens and sets, remove the slabs to obtain the gutter. Because the boards are long and heavy, it takes up to 5-7 people to carry and disassemble them, which consumes a lot of manpower; at the same time, the handling and disassembly of the boards is very time-consuming, and it takes about two days to complete a cons...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E21D11/10E21F16/02
CPCE21D11/105E21F16/02
Inventor 张法利高权何顺周王峰肖坤发刘俊徐伦军高春迎何德全孙鹏涛
Owner 中铁隧道局集团建设有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products