Installing and adjusting process before drilling and reaming for nuclear main pump
A technology of installation, adjustment, and nuclear main pump, which is applied to positioning devices, feeding devices, manufacturing tools, etc., can solve problems such as lack of experience, improve measurement accuracy, reduce human measurement errors, and ensure operation.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0021] Such as figure 1 As shown, an installation and adjustment process of the nuclear main pump before drilling and reaming uses the seam positioning method to complete the installation and adjustment of the pump cover 3 and the sealing chamber 2, places the sealing chamber 2 at the rotation center of the machine tool, and places the lower motor support 6 Place it on the pump cover 3, adjust the center of the lower motor support 6, when the center of the lower motor support 6 coincides with the center of the sealing chamber 2, use the bolt 4 and the nut 5 to tighten the sealing chamber 2, the pump cover 3, and the lower motor at the same time Bearing 6, said method comprises the following steps:
[0022] 1) Hang the pump casing 1 on the workbench of the machine tool, and install the sealing chamber 2 in the pump casing 1;
[0023] 2) Adsorb the dial indicator on the tool bar of the machine tool, turn the machine tool table, check the radial runout of the inner diameter surf...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com