A Judgment Method for the Positional Relationship Between the Shield Tail and the Segments of Large-diameter Shield TBMs
A technology of shield shield and large diameter, which is applied in the field of determining the positional relationship between the shield tail and the segment, which can solve the problems affecting the construction progress, segment misalignment, damage, etc., so as to reduce the investment of construction workers, speed up the construction production efficiency, Optimizing the effect of segment selection
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Publication Date
- 2022-03-01
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention belongs to the technical field of tunnel construction, and in particular relates to a method for determining the positional relationship between a shield tail and a segment when a shield tunneling method is used for subway tunnel construction. Background technique
[0002] Segment selection for shield tunneling is an important link in the construction of shield-tunneled subway tunnels. The quality of segment selection directly affects the posture adjustment of shield tunneling and the assembly quality of segments. The existing segment selection method is mainly based on the following data: (1) stroke difference of propulsion cylinder in each zone of shield machine; (2) shield tail clearance; (3) attitude of shield machine; (4) stroke of hinged cylinder in each zone Difference. Through the comparison of the above data, determine the segment trend, posture, position relationship with the shield tail, and fit with the trend of the shield ma...
Examples
Embodiment Construction
[0034] The overall process of the present invention is as figure 1 As shown, in the early stage of construction, according to the design drawings of the shield machine manufacturer, the calculation formulas of the propulsion cylinder stroke and hinge stroke of the selected four points are calculated through the spatial geometric relationship, and the formulas are input into the EXCEL table and then imported into the upper computer of the shield machine. After the import is completed, it can be used in the construction process.
[0035] Such as figure 2 As shown, during the shield construction process, the center of the segment 1 coincides with the center of the front shield 2 in the shield machine, and the space between the segment 1 and the shield tail 3 is geometrically parallel, which is the optimal positional relationship between the segment and the shield tail. However, in the actual construction process, because the shield machine needs to fit the design axis for excav...