Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

37results about How to "Improve construction productivity" patented technology

Building construction progress management system and a management method

The invention relates to the technical field of building construction. The invention relates to a management system, in particular to a construction progress management systemIncluding a controller, the controller is electrically connected with an information memory; the controller is electrically connected with an information acquisition module; the information acquisition module is used for acquiring construction progress information; the data importing module is used for importing construction progress information; the information acquisition module is electrically connected with a wirelessreceiving and transmitting module; the wireless receiving and transmitting module is connected with the information acquisition equipment; Data acquisition, wherein the controller is electrically connected with a progress management module, the controller is electrically connected with a three-dimensional model generation module, the three-dimensional model generation module is a three-dimensional model established according to collected information and can visually know the progress of a project, the controller is electrically connected with an information analysis module, and the information analysis module is electrically connected with an image recognition module. The invention further provides a method for managing the building construction progress. The device is simple in structureand worthy of popularization.
Owner:浙江浙东建设有限公司

Technique for fast filling constructed wetland in shore area

The invention discloses a technique for fast filling a constructed wetland in a shore area. A jetty and a separation cofferdam are adopted to divide the wetland into a plurality of hydraulic reclamation areas as required; each hydraulic reclamation area is constructed independently, so that the construction production efficiency is improved and the construction period is shortened. A bucket-wheel type dredger instead of a common cutter suction dredger is adopted to perform hydraulic reclamation construction, the discharged soil is small blocks, has the characteristic of partial saturation, is relatively shorter in solidification time, and can meet the requirement of planting plants in the wetland in short time. The bucket-wheel type dredger is utilized to borrow earth from a lake region, and the borrow pit of the separation cofferdam is filled and leveled up in an equal quantity replacement manner by adopting the hydraulic reclamation manner, so that the production efficiency is effectively improved, the project cost is reduced, and the cost is decreased. A high-strength geotechnical cloth is arranged on the inner side of the jetty, so that the hydraulic reclamation earthwork in the wetland is prevented from entering the lake region through the holes of the jetty, and the pollution to the lake water is reduced; the water permeability of the high-strength geotechnical cloth enables the water bodies of the wetland and the lake to communicate, and the influence on the wetland environment is avoided.
Owner:ANHUI SURVEY & DESIGN INST OF WATER CONSERVANCY & HYDROPOWER

Damping spring vibration isolator device with expansion sleeves and mounting and adjusting construction method thereof

The invention discloses a damping spring vibration isolator device with expansion sleeves. The device comprises an upper bearing plate component, wherein the upper bearing plate component and a lower bearing plate component are connected with an upper sleeve and a lower sleeve for mounting a damper component; the upper and lower ends of the damper component are connected into the upper sleeve and the lower sleeve through the expansion sleeves respectively; the bottom of the lower bearing plate component is connected with a height adjusting component. A mounting and adjusting construction method of the damping spring vibration isolator device with the expansion sleeves comprises the following steps: assembling the damping spring vibration isolator device with the expansion sleeves; arranging the damping spring vibration isolator device with the expansion sleeves at an equipment foundation; adjusting height, releasing pre-compression of the spring and adjusting the height again. The damping spring vibration isolator device with the expansion sleeves can be locked after the upper and lower bearing plate components and the spring are assembled and the pre-compression is applied, and is convenient to assemble and reliable to connect; the length of the damper and the height of the vibration isolator are rational; the damping spring vibration isolator device with the expansion sleeves is adjustable in height; the mounting and adjusting construction method is simple and convenient; the precision is guaranteed; the construction efficiency is favorably improved; the construction period is shortened.
Owner:柳州东方工程橡胶制品有限公司

Construction method for drainage and protection of high cutting slope side ditch

The invention provides a construction method for drainage and protection of a high cutting slope side ditch, a cutting intercepting ditch adopts a V-shaped structure, a slope adopts a trapezoidal structure, and the construction method comprises the following steps: carrying out construction lofting; construction of an intercepting ditch is conducted; excavating the cutting soil layer by layer; the slope in a preset range from the bottom elevation of the drainage ditch to the top is subjected to mortar rubble masonry slope protection; installing a water drain pipe in the mortar rubble; the slope surface, close to the roadbed, of the side ditch is constructed through cast-in-place concrete or a prefabricated panel, and the bottom of the side ditch is made of cast-in-place concrete. The slope form mainly comprises main structures such as the prefabricated concrete panel, the slope protection slurry rubbles, the drainage holes and the geotechnical cloth isolation layer, and the cutting slope protection and water interception and drainage effects can be effectively improved through the side ditch and protection slope combination form; the problem that the scouring phenomenon exists in transition connection of an existing V-shaped side ditch or U-shaped side ditch and side slope protection is solved.
Owner:CHINA MCC20 GRP CORP

Steel fiber regeneration brick granule concrete single-rib baseboard composite floor slab and manufacturing method thereof

The invention provides a steel fiber regeneration brick granule concrete single-rib baseboard composite floor slab and a manufacturing method thereof. The composite floor slab comprises a steel fiber regeneration brick granule concrete prefabricated baseboard with a single rib, and the surface of the steel fiber regeneration brick granule concrete prefabricated baseboard with the single rib is provided with a cast-in-place concrete layer. The manufacturing method comprises: preparing steel fiber regeneration brick granule concrete, preparing prefabricated baseboards, and pouring the cast-in-place concrete layer. The composite floor slab uses a novel ecological concrete material, and can effectively relieve a consumption problem of a conventional raw material, saves resources, and solves a problem of recycling urban architecture wastes. The composite floor slab is advantaged by saving energy and protecting environment, and being green and ecological. Compared with a conventional common prefabricated floor slab, the slab is advantaged by good integration, superior anti-seismic property, light weight, and relatively good adhesion and anti-shearing capability. The composite floor slab can be produced in a flow line in an industrialized manner, so buildings are industrialized and automated, resources are saved, conventional building production environment is improved, and building production efficiency is improved.
Owner:XI'AN UNIVERSITY OF ARCHITECTURE AND TECHNOLOGY

Assembled supporting frame for prefabricated stair performance detection

The invention relates to an assembled supporting frame for prefabricated stair performance detection. The assembled supporting frame comprises a height-adjustable bearing beam. The bearing beam is used for bearing a prefabricated stair, and the two ends of the bearing beam are detachably connected with supporting pieces. The bottoms of the supporting pieces are detachably connected with stabilizing supports. The height of the bearing beam can be adjusted according to the height of a prefabricated stair component, the assembled supporting frame is suitable for prefabricated floor components with different sizes, the effect that the device is recycled is achieved, different supporting devices do not need to be designed for the components with different sizes, the detection cost of the prefabricated stair component can be effectively reduced. Moreover, the assembled supporting frame is simple in structure, convenient to use and low in manufacturing cost, all components can be disassembledand assembled to achieve the purposes of convenient transportation and on-site installation, rapidness and convenience are achieved, and therefore the completion efficiency of performance testing ofthe prefabricated stair component can be greatly improved, and the improvement of the construction production efficiency of a prefabricated building is promoted.
Owner:广东省建设工程质量安全检测总站有限公司

Feeding device for fabricated concrete building construction and construction method

InactiveCN112267677AImprove the level of mechanized constructionImprove construction productivityBuilding material handlingConcrete pumpJoint (building)
The invention relates to a feeding device for fabricated concrete building construction and a construction method. The problems that the pouring amount is difficult to accurately control, the manual pouring efficiency is low and the quality is difficult to guarantee in a cast-in-place concrete pumping mode at the joint are effectively solved. According to the technical scheme, the feeding device comprises a storage bin, a wagon balance platform, a hopper and a hopper support, wherein the storage bin is used for storing concrete, a bin discharging door is arranged at the lower end of the storage bin and used for controlling discharging of the storage bin, a hopper discharging door is arranged at the lower end of the hopper and used for controlling discharging of the hopper, the hopper support is a steel structure fixing frame, a lifting hook is arranged at the upper end of the hopper support, and the outlet end of the hopper is downwards fixed in the hopper support. According to the feeding device, in combination with the fabricated concrete building construction equipment technology, rapid feeding of concrete on a fabricated structure construction site can be achieved, the mechanical construction degree of the fabricated concrete building construction site is improved, and the construction production efficiency is greatly improved.
Owner:CHINA CONSTR SEVENTH ENG DIVISION CORP LTD +2

Device for hoisting prefabricated reinforced concrete column on site and walking technology thereof

The invention relates to the field of building operations, in particular to a device for hoisting prefabricated reinforced concrete column on site and a walking technology thereof. The purpose of the invention lies in providing a simple yet effect walking technology for hoisting prefabricated reinforced concrete column on site and the device for realizing the technology; the design is simple and the operation is effective. To achieve the purpose, the invention provides the following technical proposal: the device of the invention is composed of a wheeled supporting plate, steel sheets and braking angle iron and has the following characteristics: the supporting plate is a right-angle structure, the top of the right angle is provided with deflectable rolling-over wheels, the two ends of thesupporting plate far away from the top of the right angle are respectively provided with deflectable wheels, rotary connecting rods are arranged on a deflectable wheel seat. With the device of the invention adopted, mechanical efficiency can be effectively improved, construction productivity can also be enhanced, thus accelerating construction progress and enjoying extremely noticeable economic benefits and comprehensive benefits.
Owner:DALIAN ZHUCHENG CONSTR GRP

Damping spring vibration isolator device with expansion sleeve and its installation and adjustment method

The invention discloses a damping spring vibration isolator device with expansion sleeves. The device comprises an upper bearing plate component, wherein the upper bearing plate component and a lower bearing plate component are connected with an upper sleeve and a lower sleeve for mounting a damper component; the upper and lower ends of the damper component are connected into the upper sleeve and the lower sleeve through the expansion sleeves respectively; the bottom of the lower bearing plate component is connected with a height adjusting component. A mounting and adjusting construction method of the damping spring vibration isolator device with the expansion sleeves comprises the following steps: assembling the damping spring vibration isolator device with the expansion sleeves; arranging the damping spring vibration isolator device with the expansion sleeves at an equipment foundation; adjusting height, releasing pre-compression of the spring and adjusting the height again. The damping spring vibration isolator device with the expansion sleeves can be locked after the upper and lower bearing plate components and the spring are assembled and the pre-compression is applied, and is convenient to assemble and reliable to connect; the length of the damper and the height of the vibration isolator are rational; the damping spring vibration isolator device with the expansion sleeves is adjustable in height; the mounting and adjusting construction method is simple and convenient; the precision is guaranteed; the construction efficiency is favorably improved; the construction period is shortened.
Owner:柳州东方工程橡胶制品有限公司

Hoisting method of FPSO living quarter module

The invention discloses a hoisting method of an FPSO living quarter module. The hoisting method comprises the living quarter module, a floating crane and a lifting hook, the lifting hook is arranged on the floating crane, and hoisting pads and triangular plate reinforcing structures are installed at the top of the living quarter module in a segmented manner. The hoisting method comprises the following steps that the living quarter module is carried through a slide and is hoisted onto a ship through the floating crane, during hoisting, the hoisting pad at the top of the living quarter module isconnected with the lifting hook through four groups of steel wire ropes, a double-pulley block and shackles; and ahoisting pad steel wire rope is directly hoisted on the lifting hook, and the hoisting pad steel wire rope and a steering steel wire rope respectively penetrate through pulleys at the two ends of the double-pulley block to be connected. The hoisting method of the FPSO living quarter module has the beneficial effects that the requirement for large-tonnage steel wire ropes is reduced, material waste caused by manufacturing of a hoisting beam is reduced, the dock period of the livingquarter module carried by a gantry crane in a dock is shortened, the shipbuilding production efficiency is improved, and complete building and overall installation of a living quarter are promoted.
Owner:COSCO SHIPPING SHIPYARD (NANGTONG) CO LTD +1

Technique for fast filling constructed wetland in shore area

The invention discloses a technique for fast filling a constructed wetland in a shore area. A jetty and a separation cofferdam are adopted to divide the wetland into a plurality of hydraulic reclamation areas as required; each hydraulic reclamation area is constructed independently, so that the construction production efficiency is improved and the construction period is shortened. A bucket-wheel type dredger instead of a common cutter suction dredger is adopted to perform hydraulic reclamation construction, the discharged soil is small blocks, has the characteristic of partial saturation, is relatively shorter in solidification time, and can meet the requirement of planting plants in the wetland in short time. The bucket-wheel type dredger is utilized to borrow earth from a lake region, and the borrow pit of the separation cofferdam is filled and leveled up in an equal quantity replacement manner by adopting the hydraulic reclamation manner, so that the production efficiency is effectively improved, the project cost is reduced, and the cost is decreased. A high-strength geotechnical cloth is arranged on the inner side of the jetty, so that the hydraulic reclamation earthwork in the wetland is prevented from entering the lake region through the holes of the jetty, and the pollution to the lake water is reduced; the water permeability of the high-strength geotechnical cloth enables the water bodies of the wetland and the lake to communicate, and the influence on the wetland environment is avoided.
Owner:ANHUI SURVEY & DESIGN INST OF WATER CONSERVANCY & HYDROPOWER

Molding technology and construction method of autoclaving-free self-compacting UHPC (Ultra-high performance concrete) utility tunnel

The invention discloses an intelligent molding trolley and a construction method of an autoclaving-free self-compacting UHPC (Ultra-high performance concrete) utility tunnel. The intelligent molding trolley comprises a trolley grout preparation and storage machine, an intelligent pumping and conveying machine, an intelligent measuring and controlling case, a trolley grout inlet, a trolley grout outlet, a weight inductor, a high-pressure cleaning device and a trolley integrated controller, wherein the intelligent measuring and controlling case comprises a water-binder ratio tester, an inlet grout pressure and flow measuring and controlling instrument, an outlet grout pressure and flow measuring and controlling instrument and a safety alarm system; all devices and functions of the trolleys are all controlled by the trolley integrated controller; a display screen is equipped, and is used for receiving measured data in real time; the top surface template of a utility tunnel template is evenly provided with air outlets; and the upper part of one of side templates of the utility tunnel template is evenly provided with grout outlets, and the lower part of one of side templates of the utility tunnel template is evenly provided with grout inlets. According to the intelligent molding trolley and the construction method disclosed by the invention, mechanical intelligent construction is employed; the molding trolley is controlled by the integrated controller; grout is enabled to circulate all over a pipeline; through dynamic pressure holding, residual air contained in the grout is discharged, so that the utility tunnel is greatly promoted in quality, and is more compact.
Owner:XIANGTAN UNIV

Method for judging position relation between shield tail and duct piece of large-diameter shield

The invention provides a method for judging the position relation between a shield tail and a duct piece of a large-diameter shield. The method comprises the following steps of in the early stage of construction, according to a design drawing of a shield machine manufacturer, calculating calculation formulas of thrust oil cylinder strokes and hinging oil cylinder strokes of four selected points through a space geometrical relation; further calculating a vertical position relation formula of the duct piece and the shield tail according to the calculation formulas of the thrust oil cylinder strokes and hinging oil cylinder strokes; and establishing an EXCEL table, inputting the thrust oil cylinder strokes, the hinging oil cylinder strokes, the calculation formulas of the thrust oil cylinder strokes and the hinging oil cylinder strokes of the corresponding point and the position relation judgment formula of the duct piece and the shield tail of each subarea into the table, and then importing into an upper computer of the shield tunneling machine so that the position relation between the shield tail and the duct piece can be judged. According to the method, the judgment basis of duct piece type selection is optimized, and the tunnel forming quality and the construction efficiency can be improved.
Owner:ROAD & BRIDGE INT +1

A Judgment Method for the Positional Relationship Between the Shield Tail and the Segments of Large-diameter Shield TBMs

The invention provides a method for judging the positional relationship between the shield tail and the segment of a large-diameter shield. In the early stage of construction, according to the design drawing of the shield machine manufacturer, the stroke of the propulsion cylinder and the hinge stroke of the selected four points are calculated through the spatial geometric relationship. Calculation formula, further calculate the vertical position relationship formula between the segment and the shield tail according to the calculation formula of the stroke of the propulsion cylinder and the stroke of the hinge cylinder; establish an EXCEL table, and calculate the stroke of the push cylinder, the stroke of the hinge cylinder, and the stroke of the push cylinder and the hinge cylinder of each partition The stroke calculation formula and the judgment formula for the positional relationship between the segment and the shield tail are input into the form, and then imported into the upper computer of the shield machine to judge the positional relationship between the shield tail and the segment. The invention optimizes the basis for judging the type selection of the segments, and helps to improve the tunnel forming quality and construction efficiency.
Owner:ROAD & BRIDGE INT +1

Construction method for preparing engineering bag by curing marine sludge

The invention discloses a construction method for preparing an engineering bag by curing marine sludge, and relates to the technical field of sludge treatment, and the key point of the technical scheme is that the construction method comprises the following steps: S1, preparing curing agent slurry; S2, taking the marine mud flat sludge and putting the marine mud flat sludge into a sludge pretreatment box for stirring; S3, conveying a curing agent and the pretreated sludge into a flow-state solidified soil stirring tank to be stirred; S4, introducing a proper amount of water into the flow-state solidified soil stirring tank for mixing and stirring; S5, conveying the curing agent and the slurry in the flow-state solidified soil stirring tank into a flow-state solidified soil conveying tank for secondary stirring; S6, spreading an engineering bag, and connecting the flow-state solidified soil conveying tank with a filling opening of the engineering bag through a mud conveying pipeline; and S7, using the slurry pump for conveying the flow-state solidified soil into the engineering bag through the slurry conveying pipeline, and producing the engineering bag. According to the method, the engineering bag can be filled with the flow-state solidified soil rapidly prepared from the marine sludge, the cost is saved, the sludge and water resources are reasonably utilized, and the effect of saving resources is achieved.
Owner:浙江舒谨环保科技有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products