Building construction progress management system and a management method

A technology for progress management and construction, applied in data processing applications, instruments, office automation, etc., can solve problems such as low management efficiency, and achieve the effect of improving economic benefits, strengthening information management technology, and improving construction production efficiency

Pending Publication Date: 2019-05-31
浙江浙东建设有限公司
View PDF3 Cites 8 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] The purpose of the present invention is to solve the shortcomings of low management ef

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Building construction progress management system and a management method
  • Building construction progress management system and a management method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0021] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention.

[0022] refer to Figure 1-2 , a system for building construction progress management, including a controller 1, the controller 1 is connected to an external power supply through a wire, the controller 1 is electrically connected to an information memory 2, and the information memory 2 is used to store information received by the processor 1, and control Device 1 is electrically connected with information collection module 3, information collection module 3 is to collect construction progress information, information collection module 3 is electrically connected with data import module 4, data import module 4 is to import construction progress information, and data imp...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to the technical field of building construction. The invention relates to a management system, in particular to a construction progress management systemIncluding a controller, the controller is electrically connected with an information memory; the controller is electrically connected with an information acquisition module; the information acquisition module is used for acquiring construction progress information; the data importing module is used for importing construction progress information; the information acquisition module is electrically connected with a wirelessreceiving and transmitting module; the wireless receiving and transmitting module is connected with the information acquisition equipment; Data acquisition, wherein the controller is electrically connected with a progress management module, the controller is electrically connected with a three-dimensional model generation module, the three-dimensional model generation module is a three-dimensional model established according to collected information and can visually know the progress of a project, the controller is electrically connected with an information analysis module, and the information analysis module is electrically connected with an image recognition module. The invention further provides a method for managing the building construction progress. The device is simple in structureand worthy of popularization.

Description

technical field [0001] The invention relates to the technical field of building construction, in particular to a system for managing the progress of building construction. Background technique [0002] At present, with the acceleration of industrialization and urbanization, the construction of buildings has become the norm. While paying attention to the scale and speed of construction, people also pay more attention to the quality of buildings and the safety of construction. However, the actual situation is not as expected. [0003] Data management is the process of using computer hardware and software technology to effectively collect, store, process and apply data. Its purpose is to fully and effectively play the role of data. The key to effective data management is data organization. The data structure established in the database system more fully describes the internal relationship between data, facilitates data modification, update and expansion, and at the same tim...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06Q10/10G06Q50/08
Inventor 陆佳炯徐建萍游平
Owner 浙江浙东建设有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products