Intelligent allocation method for power first-aid repair team
An electric power emergency repair and team technology, which is applied in the field of intelligent allocation of power emergency repair teams, can solve problems such as delay in emergency repair time, affecting people's normal life, and tower collapse.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0056] The specific implementation manners of the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.
[0057] Such as figure 1 As shown, the present invention discloses an intelligent allocation method of electric power repair teams, which is applied to pre-allocate emergency repair teams in a certain area before the occurrence of natural disasters, and can perform emergency response immediately after the occurrence of natural disasters, including:
[0058] Step S1, divide the area where natural disasters are predicted to occur into several standard grids, and collect the meteorological information, geographical information and power grid information corresponding to each standard grid;
[0059] Step S2, based on the meteorological information, geographical information, an...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com