Fabricated building tower crane attached external suspension type auxiliary supporting structure and construction method
A technology of auxiliary support and construction method, which is applied to building components, building structures, and on-site preparation of building components, etc., can solve problems such as reducing production efficiency, achieve easy installation and disassembly, increase the range of installation, and increase work. The effect of coverage
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0042] Such as Figure 1-7 As shown, the prefabricated building tower crane according to the embodiment of the present invention is attached to an externally suspended auxiliary support structure, including a main beam 1 welded to the outer surface of the building, and the main beam 1 is connected to the tower crane through a connector. connection, the side of the main beam 1 in the horizontal direction is welded and fixed with a horizontal slanted beam 2, the bottom of the main beam 1 is welded and fixed with a vertical slanted beam 3, and the horizontal slanted beam 2 and the vertical Both of the diagonal brace beams 3 are connected and fixed with the outer surface of the building.
Embodiment 2
[0044] Such as Figure 1-7 As shown, the connecting end of the main girder 1 and the building can be welded with ribs, and the main girder 1, the horizontal slanting beam 2 and the vertical slanting beam 3 are all composed of two The square tube is welded and fixed.
Embodiment 3
[0046] Such as Figure 1-7 As shown, according to an embodiment of the present invention, a construction method for attaching an externally suspended auxiliary support structure to a prefabricated construction tower crane is provided, which is used for attaching an externally suspended auxiliary support structure to a prefabricated construction tower crane, including the following steps;
[0047] Step S101, positioning: according to the location information of the actual basement equipment room and the main structure and the area information of the tower crane hoisting component stockyard, determine the basic position range of the tower crane main body on the basis of BIM technology, and then select the tower crane of the corresponding model, Then, according to the installation parameters of the selected tower crane equipment, determine the exact installation position of the tower body and the size of the attached overhang at one end to ensure that the distance between the fixe...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com