Report test method, device and equipment and storage medium
A test method and report technology, applied in the computer field, can solve problems such as low test efficiency, low accuracy, defect omission and defect records, etc., and achieve the effect of improving functional test efficiency and ensuring accuracy.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0026] figure 1 It is a schematic flow chart of a report test method provided by Embodiment 1 of the present invention. This embodiment is applicable to the scenario of financial-related system function test. The report test method can be executed by a report test device, which can use software and / or or by means of hardware. The device can be configured in computer equipment, and the method specifically includes:
[0027] S110. Input the entry to receive the report storage path based on the path corresponding to the target test mode.
[0028] Wherein, the target test mode includes a report comparison mode or a formula calculation mode.
[0029] The report in the embodiment of the present invention may be a financial report or other types of reports, and the specific format is not limited, for example, it may be an Excel report.
[0030] Exemplarily, the report comparison mode can be applied to a scenario where at least two reports are compared, for example, in a scenario i...
Embodiment 2
[0045] figure 2 A schematic flow chart of yet another report testing method provided by Embodiment 2 of the present invention. This embodiment further optimizes the above-mentioned embodiments, and adds an implementation method for report test in test report scenarios, specifically including the following step:
[0046] S210. When the target test mode is the report comparison mode, receive the target report storage path based on the first path input entry and receive the standard report storage path based on the second path input entry.
[0047] Wherein, the target report storage path can be used to store the target report to be tested, the standard report storage path can be used to store the standard report, and the standard report can be understood as a proofreading report for verification. Taking the above report migration scenario as an example, the standard report can be the report before migration, and the target report can be the report after migration.
[0048] Exe...
Embodiment 3
[0062] image 3 A schematic flow chart of another report test method provided by Embodiment 3 of the present invention. This embodiment is further optimized on the basis of the above-mentioned embodiments, and an implementation method applied to formula calculation test scene report test is added, specifically including Follow the steps below:
[0063] S310. When the target test mode is the formula calculation mode, input the target report storage path based on the third path input entry, and receive cell calculation relationship information based on the calculation relationship input entry.
[0064] Exemplarily, this scenario is applicable to the situation where the type and format of the report are fixed, and the calculation relationship between corresponding cells remains unchanged. In this scenario, in addition to the storage path of the uploaded target report, there is also an entry (calculation relationship input Entry) is to input the calculation relationship between t...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


