Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

53results about How to "Increase the internal friction angle" patented technology

Powder particle-high-pressure grouting crack packing gas extraction drilling and sealing device and method

ActiveCN109577908AImprove radial stabilityEasy to storeFluid removalGas removalPack materialEngineering
The invention provides a powder particle-high-pressure grouting crack packing gas extraction drilling and sealing device and method. The powder particle-high-pressure grouting crack packing gas extraction drilling and sealing device and method is applicable to underground coal mines. The powder particle-high-pressure grouting crack packing gas extraction drilling and sealing device comprises an outer bag and an inner bag, wherein the rear of the outer bag is provided with a fixing unit on a gas extraction pipe; the inner bag is provided with a screen pipe, a bag grouting pipe and a grouting pipe which penetrate through the fixing unit, the tail portions of the screen pipe, the bag grouting pipe and the grouting pipe are arranged at the rear of the outer bag, and the tail ends of the screenpipe, the bag grouting pipe and the grouting pipe are provided with valves; quick lime powder coerced by carbon dioxide is guided into the space among packing materials via the screen pipe to block fractures around a drilled hole through reaction products; cement mortar is filled in by the grouting pipe to achieve the aim of packing cracks and actively supporting the drilled hole. Therefore, thepowder particle-high-pressure grouting crack packing gas extraction drilling and sealing device can effectively reduce the influence of mining damage, prolong the effectively extraction period of drilling gas extraction, increase the concentration of extracted gas, maintain stability of the drilled hole, significantly improve the coal seam gas extracting effects and ensure safety of underground workers.
Owner:CHINA UNIV OF MINING & TECH

Grouting reinforcement method for broken top board in coal seam during surface drilling and grouting device

The invention provides a grouting reinforcement method for a broken top board in a coal seam during surface drilling and a grouting device. The method is large in operation space and does not need thespecial step of hole sealing, thereby reducing the technical difficulty of borehole grouting. Defects in the prior art are resolved such as great limit of underground grouting to drilling angles, small grouting range, great difficulty in hole sealing, outflow possibility of slurries and poor grouting effect. According to the broken top board in a coal seam and the ground condition, the grouting method comprises the following steps: setting borehole density, depth and diameter and orderly performing drilling operation; selecting proper grouting material and utilizing the grouting device to perform grouting operation. The grouting device utilizes a metering pump to suck raw material. The raw material is prepared at accurate ratio. By arranging a pressure gage and a flowmeter, grouting pressure and flow are stable and controllable. The slurry dispersion area is large. The grouting effect is good. Multi-hole grouting technology helps achieve all-round cover of the broken top board. The overall strength of super thick, relatively thick broken top boards in the coal seam are greatly increased.
Owner:ANHUI UNIV OF SCI & TECH

Rubbish landfill site intermediate covering layer and preparation method and application thereof

The invention discloses a rubbish landfill site intermediate covering layer and a preparation method and application for the rubbish landfill site intermediate covering layer and belongs to the technical field of rubbish landfill. The intermediate covering layer comprises at least three layers of function layers arranged in a stacked manner, each function layer comprises a water storage layer, a discharge guiding layer and a low permeability layer from outside to inside in sequence, the water storage layers are mainly composed of recycled fine aggregate with the particle size being less than 5mm, the discharge guiding layers are mainly composed of recycled coarse aggregate with the particle size being 10-40 mm, the low permeability layers are mainly composed of renewable powder with the particle size being less than 2 mm, and the recycled fine aggregate, the recycled coarse aggregate and the renewable powder are all obtained by processing building rubbish. By means of the intermediatecovering layer, mechanical properties of a rubbish body are improved, and the intermediate covering layer provides a certain degree of anti-permeability and air-tight function serving as temporary covering, because used materials are all landfill building rubbish in landfill sites, 'filling rubbish with rubbish', recycling utilization of the building rubbish is realized, and the rubbish landfillsite intermediate covering layer and the preparation method and application for the rubbish landfill site intermediate covering layer have the characteristics of being convenient to draw materials, low in cost, capable of saving energy, environmentally friendly, good in durability and the like.
Owner:GUANGZHOU HKUST FOK YING TUNG RES INST

Refuse landfill sealing top layer and preparation method and application thereof

The invention discloses a refuse landfill sealing top layer and a preparation method and application thereof, and belongs to the technical field of landfill. The sealing top layer comprises at least three functional layers, the functional layers comprise a water storing layer, a guiding discharging layer and a low-permeability layer which are successively stacked from outside to inside, and the water storing layer is mainly composed of recycled fine aggregates with the particle size less than 5 mm; the guiding discharging layer is mainly composed of recycled coarse aggregates with the particlesize between 10 mm-40 mm; the low-permeability layer is mainly composed of natural soil; the processing of building rubbish is conducted to obtain the recycled fine aggregates and the recycled coarseaggregates. The sealing top layer is composed of the above particle size combinations of the recycled building rubbish aggregates and the natural soil, the seepage-proofing and leakage stopping functions are effectively achieved, rubbish is filled with rubbish, the recycle of the building rubbish is achieved, the capacity occupied by the building rubbish in a landfill is released, and compared with a traditional soil sealing top layer, the refuse landfill sealing top layer has the advantages that the consumption of soil resources is greatly reduced, the construction is simple, raw materials can be conveniently obtained, the cost is low, and the durability is good.
Owner:GUANGZHOU HKUST FOK YING TUNG RES INST

Gob-side entry driving method based on complete period of roadway service and adopting grouting anchor cable

The invention relates to a gob-side entry driving method based on a complete period of roadway service and adopting a grouting anchor cable, belongs to the technical field of coal mining, and solves the problems of difficult supporting in an existing gob-side entry driving period, and complex advanced supporting operation and high labor intensity of workers in a later-period working face stoping period. The gob-side entry driving method comprises the following steps: driving along the edges of gobs in adjacent sections; laying metal meshes on the top plate and the two sides of a roadway; installing the hollow grouting anchor cable in a anchor cable hole in the top plate of the roadway, and installing a hollow grouting anchor rod and a high-strength anchor rod in anchor rod holes in the side of a coal pillar and the side of a working face separately; distributing observation equipment used for monitoring the fracture development of surrounding rock of the roadway on the surrounding rockof the roadway, and obtaining the fracture development degree of the surrounding rock of the roadway through the observation equipment; grouting to the hollow grouting anchor cable and the hollow grouting anchor rod on the basis of the fracture development degree of the surrounding rock of the roadway; and step S6, continuously cyclically repeating the steps S1-S5 until the gob-side entry drivingis completed. The gob-side entry driving method is easy to operate, and capable of greatly reducing the labor intensity of the workers, and the cost.
Owner:CHINA UNIV OF MINING & TECH

Chemical improvement curtain and well point dewatering foundation pit water stop structure and construction method

The invention discloses a chemical improvement curtain and a well point dewatering foundation pit water stop structure and a construction method. The method comprises the following steps that (1) a site is leveled to the designed elevation; (2) a foundation pit supporting and retaining structure is constructed, and a crown beam is installed at the upper end of the foundation pit supporting and retaining structure; (3) a chemically-improved grouting curtain is constructed; (4) a plurality of dewatering wells are excavated on the inner side of the chemically-improved grouting curtain, and a water suction pump is installed; and (5) the foundation pit is excavated, and graded sloping treatment is conducted till the depth of the foundation pit meets the design requirement; and the water suction pump continuously operates in the excavation process, so that the underground water level is 2.8-3.0 m below the working face. The chemically-improved grouting curtain water stop and well point dewatering foundation pit water stop combined structure is more suitable for foundation pit water stop in a water-rich silt area, and instability caused by the characteristics of large water content, low strength, large compressibility, large water permeability and the like of silt engineering can be effectively dealt with.
Owner:杭州交投建设工程有限公司 +1

Deep roadway prestress full-anchor supporting construction equipment and construction method thereof

The invention discloses deep roadway prestress full-anchor supporting construction equipment and a construction method thereof. The deep roadway prestress full-anchor supporting construction equipmentcomprises an anchor bolt for being inserted into a roadway anchor hole, an injection machine for providing primary grout and secondary grout for the anchor bolt, and a pressure maintaining pipeline for being connected with the anchor bolt and the injection machine. The anchor hole is provided with an inner end and an outer end opposite to the inner end, the anchor bolt is coaxially inserted intothe anchor hole, and the anchor bolt is provided with a first end and a second end opposite to the first end. After the anchor bolt is coaxially inserted into the anchor hole, the first end is locatedat the inner end, and the second end is located at the outer end. An injection clearance exists between the periphery of the anchor bolt and the anchor bolt, and the injection clearance at the innerend of the anchor holt is used for allowing the first grout to be injected into, so that the first end of the anchor bolt is anchored; and the injection clearance at the other positions of the anchorhole is used for allowing the secondary grout to be injected into, so that the anchor bolt is anchored in the whole length direction. And a layered grouting manner is adopted, so that the more than 90% of the clearance in the anchor holt is filled with the grout, the compactness is high, and whole-length anchoring of the anchor bolt is achieved.
Owner:淮南东华欧科矿山支护设备有限责任公司

Method for realizing gob-side entry retaining through grouting anchor cable

The invention discloses a method for realizing gob-side entry retaining through a grouting anchor cable. The method includes the steps of designing a tunnel needing to be reserved for use, isolating a goaf, and keeping the tunnel complete to serve as a transportation, ventilation and pedestrian tunnel of a next working face; constructing an anchor cable hole according to design, installing and anchoring the anchor cable and sealing the hole; reinforcing a top plate through early grouting during pushing-gathering so that the tunnel and the top plate can be glued into a whole, arranging the anchor cable along the boundary of the goaf, erecting nogs, point pillars and gangue bags along the boundary for blocking after pushing-gathering of the tunnel so that boundary overlocking and topping of the goaf can be achieved, and pressing the top plate through the goaf till the top plate breaks and naturally collapses because no support exists above the goaf so that the tunnel can be reserved. The top plate is secondarily reinforced through grouping by reasonably using the grouping anchor cable, the reinforcing effect is remarkable, the surrounding rock of the top plate is stable, the overall mechanical performance is remarkable, the horizontal stress of two banks is reduced, the overall deformation of the tunnel is reduced by about 70%, the support cost is reduced, the tunnel is not secondarily repaired, and later-period workloads are reduced.
Owner:XINWEN MINING GROUP +1

Rock cross-cut coal uncovering section coal body dust reduction and reinforcement structure and construction method thereof

The invention belongs to the technical field of coalmine production and construction, and particularly relates to a rock cross-cut coal uncovering section coal body dust reduction and reinforcement structure and a construction method thereof. The rock cross-cut coal uncovering section coal body dust reduction and reinforcement structure comprises a reinforcement layer arranged on the surface of a coal body and a plurality of water injection holes penetrating the interior of the coal body; the reinforcement layer is formed by cement spraying; the water injection holes are radially distributed in the direction from the surface of the coal body to the interior of the coal body; in the water injection stage, a dilatation water injector is arranged in each water injection hole; after completion of water injection, the water injection holes are filled with concrete, and steel wire ropes are pre-buried in the concrete. According to the rock cross-cut coal uncovering section coal body dust reduction and reinforcement structure and the construction method thereof, the water injection holes are radially distributed, in the water injection stage, as the sealing depth is great, greater water injection pressure can be applied, water can fully diffuse to moisture the coal body so as to achieve the dust reduction effect; besides, in the reinforcement stage, concrete columns in the water injection holes can wrap the coal body, so that the reinforcement effect is greatly improved.
Owner:HUAINAN MINING IND GRP

Treatment method for soft soil foundation with high water content

The invention discloses a water guide device for a soft soil foundation with high water content. The water guide device comprises a plurality of PVC pipes, high-pressure rotary spraying pipes and water drainage pipes, wherein one end of each PVC pipe is closed, and the PVC pipes are vertically placed in the soft soil foundation in rows; a plurality of reserved holes are formed in the side wall ofthe part, located in the soft soil foundation, of each PVC pipe; the high-pressure rotary spraying pipes are coaxially arranged in the PVC pipes in a sleeved mode, and outlets in the bottom ends of the high-pressure rotary spraying pipes are used for spraying air into the PVC pipes; the high-pressure rotary spraying pipes are lifted from bottom to top in the air spraying process until the high-pressure rotary spraying pipes are separated from the PVC pipes, so that high-pressure air is sprayed out from the reserved holes, and a plurality of transverse splitting drainage channels are formed inthe soft soil foundation; and the water drainage pipes are coaxially arranged in the PVC pipes in a sleeved mode, and are used for pumping and guiding water in the soft soil foundation into the PVC pipes through the drainage channels and guiding the water out through the water drainage pipes. According to the water guide device for the soft soil foundation with the high water content, the water insoft soil sludge is gathered into the PVC pipes and is discharged to the outside, so that the drainage consolidation can be accelerated, and the construction period can be shortened.
Owner:CHINA RAILWAY TUNNEL GROUP CO LTD +1

Silt slope stability control method for fixing slope by using chemical improvement reagent

The invention discloses a silt slope stability control method for fixing slope by using a chemical improvement reagent. The method comprises the following steps that 1) the chemical improvement reagent, which is a mixed solution of lime, sodium silicate, silica powder or calcium lignosulphonate and water, is prepared; 2) a chemical improvement reagent is put into a solution tank; 3) a plurality of grouting steel pipes are sequentially pressed into a silt layer of the side slope, and the grouting steel pipes are connected through grouting pipe connecting valves till the total length of the grouting steel pipes reaches the designed depth; 4) a grouting hose is connected between the solution tank and the grouting steel pipes, and a grouting pump is arranged on the grouting hose; 5) a grouting pump is started, a chemical improvement reagent is injected into the silt layer, and the grouting steel pipes are gradually lifted until the grouting steel pipes are separated from the ground surface; 6) the grouting pump is closed, and the grouting steel pipes are disassembled; and 7) the steps 3)-6) are repeated, and construction of the next grouting point is conducted till grouting is completed in all the set areas of the slope. According to the method, the internal friction angle and cohesive force of silt are increased through the chemical improvement reagent, and slope reinforcement is achieved.
Owner:杭州交投建设工程有限公司 +1

Grouting stopping sealing and blocking device and grouting anchor cable hole sealing grouting stopping method

The invention relates to a grouting stopping sealing and blocking device and a grouting anchor cable hole sealing grouting stopping method, belongs to the technical field of grouting anchor cable construction, and solves the problems that when an existing grouting stopping plug is used for broken surrounding rock grouting stopping, the grouting stopping effect of slurry is poor, slurry seepage caneasily occur, and the poor reinforcing support effect is further caused. The grouting stopping sealing and blocking device comprises a foaming agent spray head and a foaming agent injection pipe, wherein one end of the foaming agent injection pipe is connected with the foaming agent spray head; the other end of the foaming agent injection pipe is connected with the foaming agent storage tank; each of the foaming agent spray head and the foaming agent injection pipe can be arranged on the grouting anchor cable in a sleeving way and can move in a drill hole along the grouting anchor cable; anda curing foam body formed by the foaming agent sprayed out from the foaming agent spray head can be in contact with the hole wall to complete the grouting stopping sealing and blockage. The grouting stopping sealing and blocking device and the grouting anchor cable hole sealing grouting stopping method have the advantages that the sealing hole sealing and blockage in an expected position is realized; the slurry seepage during the grouting in the broken surrounding rock in a shallow part of a roadway is effectively prevented; the engineering is reliable; the environmental-friendly and energy-saving effects are achieved; and the operation is simple and convenient, and the like.
Owner:CHINA UNIV OF MINING & TECH

Expansive soil modifier and method of use thereof

The invention discloses an expansive soil improver which comprises the following components in percentage by weight: 0.1-10% of propyl diammonium N,N'-bis(octyldimethyl)-2-hydroxy-1,3-dichloride, 1-10% of potassium chloride, 0.01-10% of cationic polyacrylamide, 1-10% of water glass and the balance of water. The expansive soil improver can well inhibit the expansion potential of the expansive soil. The improved soil sample has the advantages of lower specific area, lower total pore size and higher average pore size. The plastic limit is enhanced, the plasticity index, expansibility and 50KPa free expansion rate are lowered, and the expansion property of the soil sample is improved. The shrinkage limit is enhanced, the transversal reduction ratio, vertical reduction ratio and volumetric shrinkage are lowered, and the shrinkage potential of the soil sample is fixed. The shear strength is enhanced, the CBR is increased, the strength of the soil sample is enhanced, and various indexes can satisfy the engineering construction requirements. The electron microscope spectrum of the soil sample indicates that the soil sample has obvious grain agglomeration and obvious fixing effect. The improver has favorable permeability, is simple for construction, and does not influence the people and environment in the construction process and after improvement.
Owner:GUANGXI UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products