Eureka AIR delivers breakthrough ideas for toughest innovation challenges, trusted by R&D personnel around the world.

Method for quickening construction of multiple-arch tunnel

A multi-arch tunnel and high-speed technology, which is applied in tunnels, earthwork drilling, mining equipment, etc., can solve the problems of long penetration duration of the middle partition wall, delayed construction of main tunnels on both sides, and low slag discharge efficiency, and achieves space and The effect of reasonable time, saving construction period and improving efficiency

Active Publication Date: 2013-08-14
CHINA COMM NORTH ROAD & BRIDGE +1
View PDF5 Cites 7 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0008] The technical problem to be solved by the present invention is: in the traditional construction method of multi-arch tunnel, the auxiliary construction of entering the tunnel is complicated and delays the time of the entry construction of the intermediate pilot tunnel, the slag discharge efficiency is low in the construction of the intermediate pilot tunnel, and The construction of the main tunnels on both sides is delayed due to the long duration of all partition walls, providing a method for accelerating the construction speed of multi-arch tunnels by entering the central pilot tunnel in advance, improving the efficiency of slag discharge, and parallel construction of the central partition wall and the main tunnel

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for quickening construction of multiple-arch tunnel
  • Method for quickening construction of multiple-arch tunnel
  • Method for quickening construction of multiple-arch tunnel

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0024] The present invention is described in further detail now in conjunction with accompanying drawing. These drawings are all simplified schematic diagrams, which only illustrate the basic structure of the present invention in a schematic manner, so they only show the configurations related to the present invention.

[0025] Such as Figure 1 to Figure 4 Shown is a preferred embodiment of the method for speeding up the construction of multi-arch tunnels according to the present invention. In the construction of multi-arch tunnels, firstly, the middle pilot tunnel 1 is pre-supported by using double rows of leading small conduits 1-1. Carry out the excavation of middle pilot tunnel 1 next, in the excavation process of described middle pilot tunnel 1, carry out the construction of the cover arch of left main tunnel 2, right main tunnel 3 and middle pilot tunnel 1 and long pipe shed simultaneously, in During the excavation of the pilot tunnel 1 in the first half, the waste sla...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a method for quickening construction of a multiple-arch tunnel. The method includes: firstly, pre-supporting a middle pilot tunnel; and secondly, excavating the middle pilot tunnel, constructing a left main tunnel, a right main tunnel, and a cover arch and a long pipe roof of the middle pilot tunnel, setting a widened segment allowing a loader to turn around in the middle of the middle pilot tunnel, and after the middle pilot tunnel is through, constructing a middle partition wall from an entrance of the middle pilot tunnel to an exit of the middle pilot tunnel. The method has the advantages that construction entering is assisted by advanced small pilot pipes so that entering construction period of the middle pilot tunnel is reduced; the section of the middle pilot tunnel is locally enlarged, the loader is used with a dumper for construction, and accordingly residue discharging efficiency is improved greatly; the construction method of the middle partition wall is modified, so that the main tunnels can be constructed in advance; and the middle partition wall and the main tunnels are constructed in parallel, time and space are more reasonable, and accordingly personnel idleness and machine idleness are avoided and construction speed is increased.

Description

technical field [0001] The invention relates to the technical field of road and bridge construction, in particular to a method for accelerating the construction speed of a multi-arch tunnel. Background technique [0002] With the strengthening of the concept and awareness of environmental protection, the proportion of tunnels in expressway projects is getting higher and higher. The construction of multi-arch tunnel is relatively safe, the structure is beautiful, and compared with the separate tunnel under the same geological conditions, it has the advantages of less land occupation, smooth plane alignment, and less environmental damage. Multi-arch tunnel is particularly important in nature reserves. The construction section of the pilot tunnel in the multi-arch tunnel is small, and multiple machines cannot be selected to work at the same time, which seriously affects the construction progress. The traditional construction method of the multi-arch tunnel is that the central ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E21D9/00
Inventor 尚文国许文峰刘丹娜
Owner CHINA COMM NORTH ROAD & BRIDGE
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Eureka Blog
Learn More
PatSnap group products