Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Large-diameter long pipe curtain construction method for shallowly-buried large-span under-tunnel-passing architectural structure

A construction method and large-diameter technology, applied in tunnels, tunnel linings, underground chambers, etc., to achieve clear layers of rammed earth and reduce the effect of vibration

Active Publication Date: 2015-04-08
SHENYANG RAILWAY SURVEY DESIGN CONSULTING CO LTD
View PDF4 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

When the passing structure (structure) is very sensitive to settlement, the traditional small-diameter pipe shed can no longer meet the requirements

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Large-diameter long pipe curtain construction method for shallowly-buried large-span under-tunnel-passing architectural structure
  • Large-diameter long pipe curtain construction method for shallowly-buried large-span under-tunnel-passing architectural structure
  • Large-diameter long pipe curtain construction method for shallowly-buried large-span under-tunnel-passing architectural structure

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0024] In order to further illustrate the present invention, each step of the present invention is described in detail through the following examples, but the protection scope of the present invention is not limited to the description of the following examples.

[0025] During the test construction of the technical solution of the present invention, a certain high-speed railway tunnel was selected to pass under the national key protected cultural relics earthy Great Wall ruins project, and the project was successfully applied. The specific procedures are as follows Figure 1~8 shown. A large-diameter long pipe-curtain construction method of the present invention is used to pass through a structure under a shallow-buried long-span tunnel. The tunnel consists of a reinforced concrete roof + side wall to form a door-shaped structure, and a bottom plate separated from the side wall is arranged below. In order to control the settlement of the ground surface, especially the upper Gr...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a large-diameter long pipe curtain construction method for a shallowly-buried large-span tunnel under-tunnel-passing architectural structure. The large-diameter long pipe curtain construction method comprises the following steps: (1) constructing manual hole digging supporting piles for supporting a pipe curtain and hole digging hoarding piles at the both sides; (2) pouring a pile cap beam, and forming an n-shaped supporting structure supported by the plurality of piles at the both sides of a hole; (3) pouring and jacking a steel pipe back wall, paving a steel pipe sliding way, hanging the steel pipes and forming the pipe curtain by ejecting; (4) excavating a soil body in the longitudinal length direction in a part and block manner; (5) constructing a first section rigid framework digging pile foundation of a main body, a bearing table and a rigid framework of the main body under the protection of the pipe curtain at the top and the lateral face and a temporary support, preserving anchoring lengths on vertical steel bars of the bearing table and a main body structure; pouring between the main body structure and a steel pipe; (6) repeating steps (4) and (5) until the last section of the soil body is excavated and the corresponding main body structure is poured; and (7) dismounting the n-shaped supporting structure above the bottom face of the bearing table, constructing the residual n-shaped rigid framework at the both ends, and pouring a separated type bottom board, so as to form an integral structure. With the adoption of the construction method, the normal using functions of important architectural structures at the upper part are not influenced during construction; the sedimentation of the ground and the architectural structures above the ground can be effectively controlled.

Description

technical field [0001] The invention relates to a large-diameter long pipe curtain construction method suitable for shallow-buried long-span tunnels passing through important structures, etc., and provides a structure type that can effectively reduce the impact of high-speed train vibration on important structures above, belonging to railways and Road tunnel construction field. Background technique [0002] In the construction of general railway or highway tunnels, large pipe sheds are often set up due to the low level of surrounding rock at the entrance of the tunnel (rock mass is broken or the tunnel body is located in the soil layer). The purpose of its application is mainly to prevent the surrounding rock from collapsing during the excavation stage. , Control the stratum displacement caused by construction. With the rapid development of railway and highway construction, the surrounding environment through which the line passes has become more and more complex, and the i...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E21D11/00E21D9/00
Inventor 汤波张兴刚吴瑞国黄殿辉杨敏姜雪晶臧立秋程岩张明俭高松薛庆帅周路舟
Owner SHENYANG RAILWAY SURVEY DESIGN CONSULTING CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products