A construction method of vacuum preloading consolidation drainage
A construction method and preloading technology, which can be used in infrastructure engineering, soil protection, construction, etc., and can solve problems such as the decrease of negative pressure value and the bending deformation of drainage board.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0020] The present invention will be described below in conjunction with the accompanying drawings and embodiments.
[0021] The present invention improves the existing vacuum preloading drainage technology, and adopts an iron high-rigidity round pipe as a drainage channel, but it only transmits negative pressure and does not discharge sludge. The water in the silt enters the entire longitudinal drainage channel from the lowermost drainage circular pipe, and is discharged from the soil surface through the drainage channel. During construction, the bottom layer of silt is drained and consolidated first (each layer of silt is 2 meters long). After the consolidation is completed, the drainage channel is pulled up to drain and consolidate the upper layer of silt until all layers of silt are drained and consolidated. until.
[0022] see figure 1 , figure 2 . The vacuum preloaded and consolidated vertical drainage channel used in the present invention is composed of multiple up...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com