Embodiment 1
[0021] A lateral permeable road, comprising: laying treatment soil layers 2 from bottom to top; laying clay compaction layer 3 on treatment soil layer 2; laying permeable layer 4 on clay compaction layer 3, said permeable layer consisting of Composed of gravel bags 1, the permeable gravel bags 1 are staggered and closely arranged; a leveling layer 5 is laid on the permeable layer 4; a pavement surface layer 6 is laid on the leveling layer 5, and the permeable gravel bags 1 include a permeable woven bag 12. The permeable woven bag 12 is filled with crushed stones 11 with a particle size of 15-25 mm, and the filling amount of the crushed stones is one-third to two-thirds of the capacity of the permeable woven bag 12 .
Embodiment 2
[0023] A construction method for a lateral permeable road, comprising the following steps:
[0024] Step 1 Carry out filling earthwork construction for the lower part of the soil foundation, and the filling soil is required to be 6% lime treatment soil. After the excavated road embedding is completed, the lime treatment soil is turned and compacted to form a 600mm thick treatment soil layer 2 ,
[0025] Step 2 After laying a geomembrane above the treatment soil layer 2, fill a 100mm thick clay layer above it and compact it to form an impermeable clay compaction layer 3,
[0026] Step 3 Put gravel 11 with a particle size of 15-25 mm into a permeable woven bag 12, and seal it to make a permeable gravel bag 1. The filling amount of gravel is one third to three times the capacity of the permeable woven bag. two-thirds,
[0027] Step 4: Pave the permeable woven bags 1 layer by layer and arrange them tightly on the top of the clay compaction layer 3. The number of laying layers is...
PUM
Property | Measurement | Unit |
---|---|---|
Particle size | aaaaa | aaaaa |
Particle size | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com