A Substation Model Construction Method Based on BIM and GIS

A construction method and substation technology, applied in the field of electric power, can solve problems such as shortage, achieve the effects of advanced methods, improved work efficiency and design quality

Active Publication Date: 2018-11-02
SHANGHAI MUNICIPAL ELECTRIC POWER CO +1
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] BIM technology originally originated from the needs of three-dimensional architectural design, and its application was initially mainly for the field of civil construction, lacking comprehensive applications for basic municipal engineering, especially professional engineering fields such as power facilities

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A Substation Model Construction Method Based on BIM and GIS
  • A Substation Model Construction Method Based on BIM and GIS

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0025] like figure 1 As shown, a substation model construction method based on BIM and GIS includes the following steps:

[0026] 1) Determine the electrical design scope of the substation to be modeled;

[0027] 2) Obtain the parameter data and GIS image information of the substation to be modeled;

[0028] 3) Establish a three-dimensional route design platform based on BIM and GIS according to the B / S network architecture;

[0029] 4) In the three-dimensional line design platform based on BIM and GIS, the BIM model database is constructed through the parameter data of the substation, and the spatial layout configuration is carried out according to the GIS image information;

[0030] 5) Construction of the overall model of the substation by combining the spatial layout configuration and the BIM model database, and display, query, retrieval, positioning and safety management based on the overall model of the substation.

[0031] In order to realize the standardization of BI...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a transformer station model construction method based on BIM and GIS. The method comprises the following step: firstly, determining the electric design scope of a transformer station to be constructed in model; secondly, obtaining parameter data and GIS image information of the transformer station to be constructed in model; thirdly, establishing a three-dimensional circuit design platform based on the BIM and GIS according to a B / S network configuration; fourthly, constructing a BIM model database in the three-dimensional circuit design platform based on the BIM and GIS through the parameter data of the transformer station, and carrying out space layout configuration according to the GIS image information; and fifthly, constructing a transformer station whole model through the combination of the space layout configuration and the BIM model database, and carrying out display, query, retrieval, positioning and safety management according to the transformer station whole model. Compared with the prior art, the transformer station model construction method has the advantages that the method is advanced, the coverage is comprehensive, the efficiency is improved, etc.

Description

technical field [0001] The invention relates to the field of electric power, in particular to a method for constructing a substation model based on BIM and GIS. Background technique [0002] Building Information Modeling (BIM) is based on the relevant information data of the construction project as the basis of the model to establish the building model, and can use the digital model to design, construct and operate the project. It has the characteristics of visualization, coordination, optimization, simulation and information synthesis. It is triggering an unprecedented revolution in the construction industry, realizing the transformation from traditional two-dimensional drawing to three-dimensional drawing, so that building information can be displayed more comprehensively, intelligently and intuitively. [0003] BIM technology originally originated from the needs of three-dimensional architectural design, and its application was mainly oriented to the field of civil const...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): G06F17/00G06Q50/06
Inventor 蔡钧丁一波王建军吕征宇李宾皑周亮
Owner SHANGHAI MUNICIPAL ELECTRIC POWER CO
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products