Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!
A method for rectifying and strengthening prefabricated pile foundations of high-rise buildings
What is Al technical title?
Al technical title is built by PatSnap Al team. It summarizes the technical point description of the patent document.
A technology for high-rise buildings and prefabricated piles, which can be used in construction, infrastructure engineering, etc., and can solve the problems of secondary settlement hazards, technical difficulties, and high flow deformation sensitivity.
Inactive Publication Date: 2017-01-11
LANZHOU UNIVERSITY OF TECHNOLOGY
View PDF5 Cites 0 Cited by
Summary
Abstract
Description
Claims
Application Information
AI Technical Summary
This helps you quickly interpret patents by identifying the three key elements:
Problems solved by technology
Method used
Benefits of technology
Problems solved by technology
For high-rise buildings based on prefabricated piles, using the jacking method will face the building's self-heaviness. When the prefabricated piles are used as the counter force fulcrum of the jacking system, it will accelerate the sinking and cause secondary settlement hazards; High, great influence on the building
Although the forced landing method is less risky, it is suitable for deflection correction of buildings on soft soil foundations. However, when the water content of the local foundation soil is high, the sensitivity to flow deformation is high, and high-rise buildings are self-heavy and pile foundations are often used, it is very difficult to correct deflection; Inclination rectification, heap load rectification or forced landing by rectification rectification method of foundation reinforcement will either reduce the bearing capacity of the pile tip or foundation soil, and aggravate the settlement of piles and superstructures, or the risk will be greater, the construction speed will be slow, and the settlement will be difficult to control. Uneven settlement or reverse inclination occurs again, in short, there are not many cases of quick, economical and successful deviation correction
Method used
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more
Image
Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
Click on the blue label to locate the original text in one second.
Reading with bidirectional positioning of images and text.
Smart Image
Examples
Experimental program
Comparison scheme
Effect test
Embodiment Construction
[0041] The present invention is a method for rectifying and reinforcing the prefabricated pile foundation of a high-rise building, the steps of which are as follows:
[0042] 1. Analysis of the reasons for the settlement and inclination of high-rise building 1:
[0043] ① Settlement and inclination monitoring: Before rectification and reinforcement, set a settlement observation point A on each original structural column or wall 6, the elevation H=1.5m or so, ±0.00m is the indoor ground plane M, and mark the horizontal line; Set oblique observation point B on the main control side column or wall and corner column or wall, and the elevation H = 1 height of high-rise building - (0.5~1) m. Use total stations, high-precision levels or steel rulers, and line hammers to monitor the settlement and inclination of high-rise buildings 1, analyze the settlement and inclination, find out the rotation axis E, and determine the feasibility of rectifying the inclination;
[0044] ② Supplemen...
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More
PUM
Login to View More
Abstract
The invention discloses a correction and reinforcement method for a precast pile foundation of a high-rise building. The correction and reinforcement method for the precast pile foundation of the high-rise building comprises the steps that 1, the reason for settlement and inclination is analyzed; 2, a correction and reinforcement plan is made; 3, construction for reinforcement is conducted; and 4, construction for correction is conducted. The process for analyzing the reason for settlement and inclination comprises the steps that (1), settlement and inclination are monitored; (2), supplementary investigation is conducted; (3), the pile foundation is tested; and (4), the reason for settlement and inclination is analyzed. The process of making the correction and reinforcement plan comprises the steps that (1), the reinforcement and correction thought is determined; (2), a reinforcement and correction target is determined; (3), the characteristic value of the bearing capacity of an original single pile is determined; (4), a pile supplementing principle is determined; and (5), raft supplement is calculated. The process of conducting construction for reinforcement comprises the steps that (1), the foundation is dug; (2), an original soil body is compacted; (3), the position of a supplemented pile is determined; (4), a raft foundation is constructed; (5), column (wall) legs are reinforced; (6), a static pressure pile is constructed; (7), the quality is detected; and (8), pile sealing is conducted in a reinforcement area. The process of conducting construction for correction comprises the steps that (1), a limiting stopper is machined; (2), the limiting stopper is mounted; (3), seductive correction is conducted; (4), pile sealing is conducted in a seducing area; and (5), a seductive drilled portion is repaired, and correction and reinforcement are completed.
Description
technical field [0001] The invention relates to the technical field of deflection correction and reinforcement of foundations of existing buildings. Background technique [0002] Prefabricated piles mainly include concrete prefabricated piles and steel piles. Commonly used concrete prefabricated piles are concrete solid square piles and prestressed concrete hollow pipe piles, and steel piles mainly include steel pipe piles, H-shaped steel piles and other special-shaped steel piles. According to the different pile sinking techniques, the construction methods mainly include hammering type, static pressure type, vibration type, etc.; when the geological conditions are complex, the method of leading holes can be used for pretreatment of pile sinking. Among the more than 20 types of piles currently used in my country, prefabricated piles have fewer human factors in the process of pile formation, and the quality assurance rate is relatively high. The effect of squeezing soil in l...
Claims
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More
Application Information
Patent Timeline
Application Date:The date an application was filed.
Publication Date:The date a patent or application was officially published.
First Publication Date:The earliest publication date of a patent with the same application number.
Issue Date:Publication date of the patent grant document.
PCT Entry Date:The Entry date of PCT National Phase.
Estimated Expiry Date:The statutory expiry date of a patent right according to the Patent Law, and it is the longest term of protection that the patent right can achieve without the termination of the patent right due to other reasons(Term extension factor has been taken into account ).
Invalid Date:Actual expiry date is based on effective date or publication date of legal transaction data of invalid patent.