Correction and reinforcement method for precast pile foundation of high-rise building

A technology for high-rise buildings and prefabricated piles, which can be used in construction, infrastructure engineering, etc., and can solve problems such as high tilt correction costs, large building impacts, and reduced pile ends or foundation soil bearing capacity.

Inactive Publication Date: 2015-10-14
LANZHOU UNIVERSITY OF TECHNOLOGY
View PDF5 Cites 17 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

For high-rise buildings based on prefabricated piles, using the jacking method will face the building's self-heaviness. When the prefabricated piles are used as the counter force fulcrum of the jacking system, it will accelerate the sinking and cause secondary settlement hazards; High, great influence on the building
Although the forced landing method is less risky, it is suitable for deflection correction of buildings on soft soil foundations. However, when the water content of the local foundation soil is high, the sensitivity to flow deformation is high, and high-rise buildings are self-heavy and p

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Correction and reinforcement method for precast pile foundation of high-rise building
  • Correction and reinforcement method for precast pile foundation of high-rise building
  • Correction and reinforcement method for precast pile foundation of high-rise building

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0041] The present invention is a method for rectifying and reinforcing the prefabricated pile foundation of a high-rise building, the steps of which are as follows:

[0042] 1. Analysis of the reasons for the settlement and inclination of high-rise building 1:

[0043] ① Settlement and inclination monitoring: Before rectification and reinforcement, set a settlement observation point A on each original structural column or wall 6, the elevation H=1.5m or so, ±0.00m is the indoor ground plane M, and mark the horizontal line; Set oblique observation point B on the main control side column or wall and corner column or wall, and the elevation H = 1 height of high-rise building - (0.5~1) m. Use a total station, high-precision level or steel ruler, line hammer, etc. to monitor the settlement and inclination of the high-rise building 1, analyze the settlement and inclination, find out the rotation axis E, and determine the feasibility of rectifying the inclination;

[0044] ② Supple...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a correction and reinforcement method for a precast pile foundation of a high-rise building. The correction and reinforcement method for the precast pile foundation of the high-rise building comprises the steps that 1, the reason for settlement and inclination is analyzed; 2, a correction and reinforcement plan is made; 3, construction for reinforcement is conducted; and 4, construction for correction is conducted. The process for analyzing the reason for settlement and inclination comprises the steps that (1), settlement and inclination are monitored; (2), supplementary investigation is conducted; (3), the pile foundation is tested; and (4), the reason for settlement and inclination is analyzed. The process of making the correction and reinforcement plan comprises the steps that (1), the reinforcement and correction thought is determined; (2), a reinforcement and correction target is determined; (3), the characteristic value of the bearing capacity of an original single pile is determined; (4), a pile supplementing principle is determined; and (5), raft supplement is calculated. The process of conducting construction for reinforcement comprises the steps that (1), the foundation is dug; (2), an original soil body is compacted; (3), the position of a supplemented pile is determined; (4), a raft foundation is constructed; (5), column (wall) legs are reinforced; (6), a static pressure pile is constructed; (7), the quality is detected; and (8), pile sealing is conducted in a reinforcement area. The process of conducting construction for correction comprises the steps that (1), a limiting stopper is machined; (2), the limiting stopper is mounted; (3), seductive correction is conducted; (4), pile sealing is conducted in a seducing area; and (5), a seductive drilled portion is repaired, and correction and reinforcement are completed.

Description

technical field [0001] The invention relates to the technical field of deflection correction and reinforcement of foundations of existing buildings. Background technique [0002] Prefabricated piles mainly include concrete prefabricated piles and steel piles. Commonly used concrete prefabricated piles are concrete solid square piles and prestressed concrete hollow pipe piles, and steel piles mainly include steel pipe piles, H-shaped steel piles and other special-shaped steel piles. According to the different pile sinking techniques, the construction methods mainly include hammering type, static pressure type, vibration type, etc.; when the geological conditions are complex, the method of leading holes can be used for pretreatment of pile sinking. Among the more than 20 types of piles currently used in my country, prefabricated piles have fewer human factors in the process of pile formation, and the quality assurance rate is relatively high. The effect of squeezing soil in l...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E02D35/00E02D27/14
Inventor 朱彦鹏杨校辉王秀丽张艳军马孝瑞郭楠
Owner LANZHOU UNIVERSITY OF TECHNOLOGY
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products