Ecological slope protection structure for ion rare earth mine
An ion-type rare earth and ecological slope protection technology, which is applied in infrastructure engineering, horticulture, botanical equipment and methods, etc., can solve the problems of easy deformation of soil, high engineering cost, unfavorable plant growth, etc., to improve anti-skid ability, Improve the shear strength, beneficial to the effect of stability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Benefits of technology
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0039] The width of the bottom of the slope is 38 meters, the height of the slope is 6 meters, and the length of the slope is 8.5 meters.
[0040] Such as figure 1 Shown, the present invention comprises bamboo framework 1, bamboo stake 2, drainage pipe 3, tree 4, slope bottom drainage ditch 5, side slope side drainage ditch. The bamboo frame 1 is placed on the slope surface 7, the drain pipe 3 is driven into the soil layer of the slope surface 7 through the through hole 102 opened on the bamboo frame frame bar 101, and the bamboo pile 2 is driven into the slope surface 7 and in grading and leveling ground 8, drive into bamboo pile 2 on both sides up and down of bamboo frame 1 simultaneously, and tree 4 kinds are on grading and leveling ground 8, and slope bottom drainage ditch 5 is positioned at the bottom of slope 6 of side slope, and side slope The side drains are located on the upper, left and right edges of the slope surface 7.
[0041] Such as figure 2 As shown, the b...
Embodiment 2
[0055] The width of the bottom of the slope is 76 meters, the height of the slope is 10 meters, and the surface of the slope is irregular.
[0056] Such as Figure 4 Shown, the step that present embodiment implements is: (1) at first slope body 9 is carried out slope cutting, levelling, and side slope is repaired into two grades of side slopes, and every grade of side slope slope height is 5 meters, and every grade of side slope slope surface 7 The length is 7.07 meters, the slope angle is 45°, and the width of the leveling ground 8 between the two grades of side slopes is 4 meters. (2) Digging side drains around the slope body 9 . (3) Digging and setting up the drainage ditches 5 at the bottom of the slope 6 . (4) Carry out the processing of the bamboo frame bar 101 of the bamboo frame 1 while steps (1), (2), and (3) are implemented, and process the bamboo stake 2 and the drain pipe 3 simultaneously. (5) Install the bamboo frame 1 on the slope surface 7 of the two-stage sl...
PUM
Property | Measurement | Unit |
---|---|---|
Thickness | aaaaa | aaaaa |
Diameter | aaaaa | aaaaa |
Length | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com