Crane and engineering machinery counter weight penetrating pin device thereof
A technology of construction machinery and pinning, applied in cranes and other directions, can solve the problems of inconvenient disassembly work, only axial disassembly, and large axial disassembly space.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0021] The invention provides a counterweight pin-threading device of construction machinery, which realizes the provision of a counterweight pin-threading device of construction machinery that requires less axial disassembly space. The present invention also provides a crane comprising the above-mentioned counterweight pin-threading device for engineering machinery.
[0022] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts fall within the protection scope of the present invention.
[0023] figure 1 It is a structural diagram of the installation state of the construction ma...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 