A construction method and technology of post-casting belts, which are applied in the direction of formwork/formwork/work frame, building structure, and on-site preparation of building components, which can solve the complex installation and dismantling process, affect the construction period, and cumbersome construction process and other problems, to achieve the effect of simple support and dismantling, simple processing and high construction efficiency
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Publication Date
- 2017-01-04
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention belongs to the technical field of post-cast belt construction, and in particular relates to a construction method for a folded structural plate post-cast belt joint formwork. Background technique
[0002] The post-pouring strip is a temporary part set at the corresponding positions of the foundation floor, wall and beam in order to prevent the harmful cracks that may occur in the cast-in-place reinforced concrete structure due to uneven shrinkage or uneven settlement during construction. construction joints. When supporting the post-cast strip formwork, in addition to meeting the requirements of tightness and firmness, it should also meet the requirements of easy removal of the formwork. However, the traditional post-cast belt formwork support method currently adopted is to use wooden formwork support or steel wire mesh to block the construction process. The construction process is relatively cumbersome, and the materials such as wood fo...
Examples
Embodiment Construction
[0057] Such as figure 1 The construction method of a folded structural slab post-casting joint formwork shown includes the following steps:
[0058] Step 1. Supporting of the forming formwork of the structural slab: supporting the forming formwork of the constructed structural slab; the forming formwork includes a bottom formwork 13 supported under the constructed structural slab and a side formwork arranged on the bottom formwork 13 The constructed structural slab is a cast-in-place reinforced concrete slab that is laid horizontally, and the bottom template 13 is laid horizontally, see figure 2 ;
[0059] The cast-in-place reinforced concrete slab is provided with a bottom reinforcement mesh and a surface layer reinforcement mesh above the bottom reinforcement mesh, the bottom reinforcement mesh and the surface layer reinforcement mesh are arranged horizontally and both are formed by The vertical horizontal steel bars are bound with multiple horizontal horizontal steel bar...