Integral mobile construction method of double-column pier and middle tie beam truss

A technology of overall movement and girder truss, which is applied in the direction of bridges, bridge construction, erection/assembly of bridges, etc. It can solve the problems of affecting the surface quality of pier body, slow progress of high bridge pier, damage to the inner quality of concrete, etc., to save non-structural materials , Less construction land and faster construction speed

Active Publication Date: 2018-03-30
CHINA RAILWAY SIXTH GRP CO LTD
View PDF7 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] In order to solve the obvious slow progress of the high pier of the bridge by using the traditional turning formwork and climbing formwork construction, the present invention adopts the sliding formwork construction, although the progress is fast, but due to the large friction force generated by the sliding between the concrete and the formwork, the pier body is affected. The surface quality will also damage the inner quality of the concrete. A method of integral mobile construction of double-column piers and middle tie beam trusses is provided.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Integral mobile construction method of double-column pier and middle tie beam truss
  • Integral mobile construction method of double-column pier and middle tie beam truss
  • Integral mobile construction method of double-column pier and middle tie beam truss

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0021] The B2-1 work area of ​​the southeast section of the Ring Expressway in a city has a total length of 4.29km. The entire line is two-way and six-lane. There are 6 bridges with a total length of 2.32km. The pier columns are all in the form of double-column bridge piers with transverse beams installed between them. , a total of 209 pier columns, a total of 223 tie beams, and 50 pier columns larger than 40 meters. The cross-section type is a variable cross-section solid pier or a thin-walled hollow pier. The project started in September 2014 and was completed in October 2016.

[0022] The construction period of the project is tight, the quality and environmental protection requirements are high, and the risk is relatively high. Through in-depth research on the structural form and construction process of the pier body and the middle tie beam, the overall mobile construction method of the double-column pier and the middle tie beam truss is summarized, which not only meets the...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention belongs to the technical field of bridge construction and provides a two-column pier and middle tie beam construction method employing integral movement of trusses. By means of the construction method, the problems that traditional turnover form construction and climbing form construction are slow in construction progress of high bridge piers, and slip form construction affects the surface quality of pier bodies and damages inherent quality of concrete are solved. A truss platform, lifting frames, an auxiliary platform, supporting rods, a hydraulic system and formwork systems are included. The truss platform comprises transverse trusses and longitudinal trusses. The transverse trusses on the inner side are detachably connected with the truss platform. An upper opening and a lower opening of the truss platform are provided with two layers of jackscrews. An upper main rib and a lower main rib of each truss are provided with jackscrew fixing devices. The lower portion of the truss platform is connected with the auxiliary platform. The lifting frames and the truss platform are connected into a whole. Each lifting frame is supported on the corresponding supporting rod through a jack installed on a cross beam of the lifting frame. The lower ends of the supporting rods are embedded in concrete. The upper ends of the supporting rods penetrate through through holes of the hydraulic jacks. A bridge pier and a middle tie beam are constructed synchronously and quickly, the construction period is shortened, cost is reduced, operability is high, the method is economical and reasonable, and good economic benefits and social benefits are achieved.

Description

technical field [0001] The invention belongs to the technical field of bridge construction, and in particular relates to a method for integrally moving a double-column pier and a middle tie beam truss. Background technique [0002] With the continuous development of the economy, the infrastructure construction has been further accelerated, and domestic bridge construction is increasing, especially in mountainous areas. There are more and more construction projects. The technology of setting transverse beams between double-column bridge piers to increase the lateral stiffness of the piers is used in mountainous highway bridges. It has been widely used in construction. High piers are often encountered in bridge construction. In recent years, the height of piers has grown from 30 to 50 meters to over 100 meters. The construction of high piers in mountainous areas is often restricted by terrain and landform conditions. The construction of high piers urgently needs to be standard...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E01D21/00
CPCE01D21/00
Inventor 张建国丁国盛吴敦彬贾爱卿雷雪东杜博文梁肖杰曹敬马超周凯李煜孙继红罗登魁郭令贺
Owner CHINA RAILWAY SIXTH GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products