Cold and arid region tunnel gentle slope type portal snow blowing prevention forest building and planting method
A technology for cold and arid areas and tunnels, which is applied in the field of anti-blowing snow forest planting at tunnel entrances with slow waves in cold and arid areas. The effect of saving irrigation water and contributing to vigorous growth
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0027] Such as figure 1 , 2 Shown, the anti-blowing snow forest construction method at the tunnel entrance in this cold and arid area is to plant snow-proof forest belts 8 on both sides of the road in front of the tunnel entrance of mountain range 6, and build a snow storage hedge 3 on the gentle slope at the tunnel entrance 2; said snow-proof forest belt 8 Extending 500-1000 meters from the entrance, it is composed of shrub hedges 11 and snow-proof forests 12 arranged in a staggered manner. There are snow-blocking forests 7 and 9, which are arranged in a figure-eight shape. The snow-blocking forest is about 100 meters away from the entrance of the cave. The length of the snow-blocking forest is 300-500 meters. Forest 7 is a mixed forest of Pinus sylvestris and spruce. The shrub hedge 11 is configured in a strip shape, compact structure, 2 rows of shrubs, the spacing between plants and rows is 0.5m×0.5m, and the strip-shaped soil preparation is arranged in the shape of a cha...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com