Intelligent inventory early warning and management system based on BIM (Building Information Modeling) model

A management system and inventory technology, applied in the field of intelligent inventory early warning management system, can solve problems such as untimely inventory control strategy, unfavorable procurement, and poor production plan of construction enterprises, so as to achieve efficient production inventory balance, reduce economic losses, and improve customer satisfaction. The effect of quality of service

Pending Publication Date: 2017-09-05
ZHEJIANG JINGGONG STEEL BUILDING GRP
View PDF4 Cites 10 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0006] The purpose of the present invention is to solve the problems of poor production planning and unfavorable procurement of construction enterprises caused by untimely and unreasonable inventory control strategies at this stage, so as to maintain stable production and inventory, balance the occupation of circulating funds, and improve customer satisfaction services

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Intelligent inventory early warning and management system based on BIM (Building Information Modeling) model

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0026] The present invention will be further explained below in conjunction with the drawings and implementation cases:

[0027] Implementation case process: see Figure one

[0028] The intelligent inventory early warning management system based on the BIM model of the present invention has been put into operation. The specific steps are as follows:

[0029] Step 1: Import the BIM model of Revit, Tekla, Navisworks, Rhinoceros, CATIA and other format files into the system. The initial color of the BIM model component is gray, and the corresponding name, unique number, length, and weight are attached. A series of information such as, specifications, materials, etc. The initial color of the component is positioned as gray;

[0030] The second step: According to the actual construction situation on site and the next construction plan, generate a request task plan based on the BIM model in the system and send it to the factory. At the same time, the corresponding required components in t...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to an intelligent inventory early warning and management system based on a BIM (Building Information Modeling) model. The method comprises the following steps: 1, a BIM model is imported to the system; 2, a cargo requirement task plan based on the BIM model is generated in the system, and the cargo requirement task plan is sent to a factory; 3, the BIM cargo requirement plan is subjected to model decomposition, and the material amount for needed component types is counted; 4, the system judges the current inventory; 5, the system judges an insufficient component material amount, if the cargo requirement plan time is smaller than needed time T, first-level inventory early warning is triggered, or otherwise, second-level inventory early warning is triggered; 6, coordinated purchasing is carried out on component list materials; and 7, the system detects whether the current inventory meets enterprise safety inventory. The informatization operation level of inventory management of a construction enterprise is enhanced.

Description

Technical field [0001] The invention patent belongs to the application field of building information models, and specifically relates to an intelligent inventory early warning management system based on a BIM model. [0002] technical background [0003] BIM, or Building Information Modeling, is a big data based on various relevant information data of a construction project. The integrated building information model is a detailed expression of the relevant information of the construction project. BIM is also a new technical concept. It is a new technology for the construction industry, using digital informatization models as the carrier, and using informatization models in all stages of project construction to dynamically manage the entire life cycle of construction projects. [0004] In recent years, with the rapid development of the construction industry and the tremendous changes in the market competition environment, many construction companies engaged in production and managemen...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/08G06Q10/04
CPCG06Q10/04G06Q10/087G06Q10/0875
Inventor 何敏杰刘中华王强强徐立丰高良刘天成孟玲霄陈泉
Owner ZHEJIANG JINGGONG STEEL BUILDING GRP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products