Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Guard post for roadbed construction and roadbed construction method

A technology for marking columns and roadbeds, which is applied in the field of roadbed construction marking equipment and roadbed construction, can solve the problems of inconvenient roadbed construction and insignificant role of marking columns and markings, and achieves the effects of simple structure, simple production and improved construction efficiency.

Pending Publication Date: 2017-11-10
CANGZHOU BOHAI NEW DISTRICT CHENHE ENG
View PDF1 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The purpose of the present invention is to provide a roadbed building marker and a roadbed construction method to solve the problem that the existing marker markers have no obvious marking effect and the roadbed construction is inconvenient

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Guard post for roadbed construction and roadbed construction method
  • Guard post for roadbed construction and roadbed construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0018] like figure 1 , figure 2 As shown, the structure of the present invention includes a cylindrical post body 1 and an elastic steel belt 2 plugged in the center of the post body. The post body 1 has a diameter of 50 mm and a height of 120 mm, which can be formed by condensation of various building materials. , the shear strength is within the range of shear strength that can be scraped off by the leveling machine, and the compressive strength is not lower than the strength of the surrounding foundation. The elevation control line 3 of the roadbed construction is set at a height of 100mm from the main body of the pillar. The marking column body 1 is divided into an upper monochrome column section 4 and a lower monochrome column section 5; the elevation control line is located on the upper monochrome column section, and the upper end of the elevation control line 3 up to the upper monochrome column section 4 is the specified subgrade construction. The height of the deviat...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

PropertyMeasurementUnit
Heightaaaaaaaaaa
Login to View More

Abstract

The invention relates to a guard post for roadbed construction and a roadbed construction method. The structure of the guard post for the roadbed construction comprises a cylindrical guard post body and an elastic steel strip which is inserted at the center of the guard post body; the shear strength of the guard post is within the shear strength range within which the guard post body can be scraped by a scraping machine; the height of the guard post body is not less than 120 mm; the elevation control line of the roadbed construction is set at a height of at least 100 mm on the guard post body; the guard post body comprises an upper monochromatic column section and a lower monochromatic column section; the bottom end of the elastic steel strip is fixed at the center of the lower monochromatic column section; and the top end of the elastic steel strip is higher than the top surface of the guard post body. The guard post for the roadbed construction has the advantages of obvious marking effect, convenient use, simple and convenient making and so on.

Description

technical field [0001] The invention relates to a roadbed construction marking tool and a roadbed construction method, in particular to a roadbed construction marking post and a roadbed construction method. Background technique [0002] During the construction of the subgrade of the road square, elevation control is an important factor related to the construction quality. The elevation thickness of lime soil at each step requires elevation control. If the thickness of lime soil is inconsistent, it will lead to inconsistent compaction of this layer of soil, which will not only affect the construction of subsequent processes, but also affect the construction quality. If the gray soil elevation exceeds the error range, it will inevitably lead to rework and reconstruction of the project. Therefore, elevation control is a tedious and important task for construction and road construction enterprises. [0003] The patent document (ZL201320767770.X) discloses a kind of white gray...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E01C23/01
CPCE01C23/01
Inventor 王胜旺
Owner CANGZHOU BOHAI NEW DISTRICT CHENHE ENG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products