Multi-thread-based measurement control method and device

A measurement control, multi-threading technology, applied in the field of communication, can solve the problems of long delay of test tasks, affecting test efficiency, low efficiency of consistency test of terminal integrated tester, etc., and achieve the effect of improving test efficiency and improving efficiency

Active Publication Date: 2018-06-08
CHINA UNITED NETWORK COMM GRP CO LTD
View PDF5 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] Embodiments of the present invention provide a multi-thread-based measurement control method and device to solve the problem that the measurement control modules of the current terminal comprehensive tester are mostly implemented in a single-threaded manner, that is, a new test can only be started after the previous test task is completed. task, the test of the new measurement item can only be started after the multiple test tasks of the previous measurement item are completed one by one. The long delay of any test task will affect the overall test efficiency and lead to the consistency test of the terminal comprehensive tester. the problem of low efficiency

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Multi-thread-based measurement control method and device
  • Multi-thread-based measurement control method and device
  • Multi-thread-based measurement control method and device

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0022] figure 1 This is a flowchart of the multi-thread-based measurement control method provided in Embodiment 1 of the present invention. According to the embodiment of the present invention, the measurement control module of the current terminal comprehensive tester is mostly implemented in a single-threaded manner, that is, a new test task can only be started after the previous test task is completed, and multiple test tasks of the previous measurement item are completed one by one. After that, the test of a new measurement item can be started. The long delay of any test task will affect the overall test efficiency, resulting in the low efficiency of the consistency test of the terminal integrated tester. It provides measurement control based on multi-threading. method. like figure 1 The specific steps of this method are as follows:

[0023] Step S101, creating a measurement control thread, a primitive parsing thread, a data cache thread, a data upload thread and a stat...

Embodiment 2

[0033] figure 2This is a flowchart of the multithread-based measurement control method provided by the second embodiment of the present invention. On the basis of the above-mentioned first embodiment, in this embodiment, by scheduling the measurement control thread, the primitive parsing thread, the data cache thread, the data upload thread and the state control thread, the test process of at least two measurement items is performed in parallel. The measurement control includes: receiving the measurement preparation message sent by the measurement algorithm module by scheduling the measurement control thread, completing the measurement preparation work according to the measurement preparation message, and sending the measurement preparation complete message to the measurement algorithm module, so that the measurement algorithm module according to the measurement preparation complete message. The language parsing thread sends measurement primitive messages of at least two meas...

Embodiment 3

[0065] image 3This is a flowchart of the multi-thread-based measurement control method provided in Embodiment 3 of the present invention. On the basis of the second embodiment above, in this embodiment, if multiple measurements are performed on the test item, the data upload thread is scheduled to correspond to the measurement item identifier in the target upload notification according to the measurement item identifier in the target upload notification. After the measurement data of the measurement item in the cache area is uploaded to the terminal to be tested, the method further includes: recording the completion times of the upload processing of the measurement item measurement data corresponding to the measurement item identifier in the target upload notification by scheduling the data upload thread; If the number of times is less than the preset threshold, a cache notification is issued to the data cache thread by scheduling the data upload thread, and the cache notific...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

Embodiments of the invention provide a multi-thread-based measurement control method and device. The method comprises the following steps of establishing a measurement control thread, a primitive analysis thread, a data caching thread, a data uploading thread and a state control thread; and measuring and controlling testing processes of at least two measurement items in parallel through schedulingthe measurement control thread, the primitive analysis thread, the data caching thread, the data uploading thread and the state control thread. According to the embodiments of the invention, the measurement control module is divided into a plurality of function modules, the measurement control thread, the primitive analysis thread, the data caching thread, the data uploading thread and the statecontrol thread are established, and the testing processes of at least two measurement items can be measured and controlled in parallel by scheduling the threads, so that the overall testing efficiencyof at least two measurement items is improved, and thus the consistency test efficiency of a terminal comprehensive tester is improved.

Description

technical field [0001] Embodiments of the present invention relate to the field of communication technologies, and in particular, to a method and device for measurement control based on multithreading. Background technique [0002] In the mobile communication terminal certification test, the RF conformance test is one of the most core tests. The terminal integrated tester is the core equipment of the RF conformance test. It can not only simulate the function of the core network, but also complete the test of the RF conformance index. [0003] The terminal comprehensive tester completes the test of the RF conformance index through the measurement software. The measurement software includes a measurement algorithm module and a measurement control module. The measurement algorithm module runs on the Windows system to implement the preset measurement methods for each RF index; the measurement control module runs on a digital signal processing technology (Digital Signal Process,...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): H04B17/00G06F9/48
CPCG06F9/4843H04B17/00
Inventor 徐佳琪严斌峰温锋
Owner CHINA UNITED NETWORK COMM GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products