A treatment process for tunnel construction wastewater
A technology for tunnel construction and wastewater, applied in the field of water pollution control, can solve the problems of low wastewater treatment efficiency, poor treatment effect, and difficulty in meeting discharge standards, and achieve the effects of reducing transportation costs, improving treatment speed, and easy precipitation.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0027] combine Figure 1-6 The shown tunnel construction wastewater treatment process mainly adopts the following equipment and facilities: grit chamber 1 , flocculation settler 3 , mud pond 4 , and sludge dewaterer 6 . The grit chamber 1 and the mud pond 4 are constructed on-site at the construction site, and concrete pond bodies are usually used. After the flocculation settler 3 and the sludge dewatering machine 6 are manufactured, they are assembled at the tunnel construction site. The grit chamber 1, the flocculation-settler 3, the mud pond 4, and the sludge dewatering machine 6 can all adopt existing conventional settings or commercially available conventional models, such as the grit chamber 1 is a simple rectangular tank body with one end The water inlet is set, and the first pump machine 2 is set at the other end. The tunnel construction waste water is passed into the grit chamber 1 through the water inlet, and then undergoes natural sedimentation, and is finally pum...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com