Soil amelioration method for coal subsidence area
A technology for soil improvement and subsidence area, applied in land preparation methods, fertilization methods, applications, etc., can solve problems such as damage to agricultural infrastructure, loss of soil nutrients and organic matter, deterioration of agricultural production environment, etc. and support, reduce the occurrence of pests and diseases, and reduce the effect of farming troubles
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0038] A soil improvement method in a coal subsidence area;
[0039] The technical problem to be solved by the present invention adopts the following technical solutions to realize:
[0040] A soil improvement method in a coal subsidence area, the improvement technology is as follows:
[0041] 1. To clean up the coal and gangue in the soil in the coal subsidence area, first use a stone picker to clean up the large pieces of coal and gangue existing on the surface of the soil. The length or width of the coal gangue and coal is ≥ 6cm; The soil was repeatedly plowed 4 times until there were no large pieces of coal and coal gangue in the soil;
[0042]2. In step 1, plow the soil 4 times at the same time, add the corrosive agent and pH electrolyte to the soil, and evenly distribute the corrosive agent in the soil by plowing, and spray the pH electrolysis firstly during the 1st and 2nd plowing When the soil is plowed for the 3rd and 4th times, the corrosive agent is added, and the...
Embodiment 2
[0061] A soil improvement method in a coal subsidence area;
[0062] The technical problem to be solved by the present invention adopts the following technical solutions to realize:
[0063] A soil improvement method in a coal subsidence area, the improvement technology is as follows:
[0064] 1. To clean up the coal and gangue in the soil in the coal subsidence area, first use a stone picker to clean up the large pieces of coal and gangue existing on the surface of the soil. The length or width of the coal gangue and coal is ≥ 6cm; The soil was repeatedly plowed 5 times until there were no large pieces of coal and coal gangue in the soil;
[0065] 2. In step 1, plow the soil 5 times at the same time, add the corrosive agent and pH electrolyte to the soil, and evenly distribute the corrosive agent in the soil by plowing, and spray the pH electrolysis firstly during the 1st and 2nd plowing When the soil is plowed for the 3rd, 4th and 5th time, add corrosive agent, the dosage ...
PUM
Property | Measurement | Unit |
---|---|---|
Diameter | aaaaa | aaaaa |
Relative density | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com