[0051] Such as figure 1 and figure 2 As shown, in the asphalt mixture hoop structure provided in this embodiment, the hoop plate 1 is made of iron and consists of 12 layers of hoop plates 1, and the total thickness of the asphalt layer is 60 mm.
[0052] The shape of the through holes 2 is a square with a diameter of 10 mm and 7.2×7.2 mm, the distance between the through holes 2 is 5 mm, and the thickness of the ferrule plate 1 is 5 mm.
[0053] The tapered positioning rod 4 is connected with the hoop plate 1 by welding, the diameter of the bottom of the tapered positioning rod 4 is 5 mm, and the diameter of the bottom of the tapered positioning hole 3 is 5.5 mm.
[0054] The construction method of above-mentioned ferrule structure comprises the following steps:
[0055] (1) The hoop plate 1 of the bottom layer is laid on the pavement base, the asphalt mixture is poured in the through hole 2, and the pouring thickness is 1.2 times of the thickness of the hoop plate 1, and t...
Embodiment 2
[0068] Such as figure 1 and image 3 As shown, in the asphalt mixture hoop structure provided in this embodiment, the hoop plate 1 is made of iron and consists of 12 layers of hoop plates 1, and the total thickness of the asphalt layer is 60 mm.
[0069] The shape of the through holes 2 is a circle with a diameter of 10 mm, the distance between the through holes 2 is 5 mm, and the thickness of the ferrule plate 1 is 5 mm.
[0070] The tapered positioning rod 4 is connected with the hoop plate 1 by welding, the diameter of the bottom of the tapered positioning rod 4 is 5 mm, and the diameter of the bottom of the tapered positioning hole 3 is 5.5 mm.
[0071] The specific construction method and strength test method are shown in Example 1.
Embodiment 3
[0073] Such as figure 1 and Figure 4 As shown, in the asphalt mixture hoop structure provided in this embodiment, the hoop plate 1 is made of iron and consists of 5 layers of hoop plates 1, and the total thickness of the asphalt layer is 60 mm.
[0074] The shape of the through holes 2 is a circle with a diameter of 24 mm, the distance between the through holes 2 is 10 mm, and the thickness of the hoop plate 1 is 12 mm.
[0075] The tapered positioning rod 4 is connected with the hoop plate 1 by welding, the diameter of the bottom of the tapered positioning rod 4 is 8 mm, and the diameter of the bottom of the tapered positioning hole 3 is 8.5 mm.
[0076] The construction method of above-mentioned ferrule structure comprises the following steps:
[0077] (1) The hoop plate 1 of the bottom layer is laid on the pavement base, the asphalt mixture is poured in the through hole 2, and the pouring thickness is 1.2 times of the thickness of the hoop plate 1, and the asphalt mixtur...
PUM
| Property | Measurement | Unit |
|---|---|---|
| diameter | aaaaa | aaaaa |
| diameter | aaaaa | aaaaa |
| diameter | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 