Method and system for dynamic management of whole-process cost of project

A dynamic management, whole-process technology, applied in office automation, data processing applications, instruments, etc., can solve the problems of cost engineer budget and evaluation impact, etc., to achieve the effect of multiple acquisition channels, reduced workload, and easy updating

Inactive Publication Date: 2018-12-21
广东展诚工程咨询有限公司
View PDF6 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] However, the project cost requires multiple budgets and evaluations, and the actual land, equipment, technical labor services, and contract prices are constantly changing, which has a certain impact on the budget and evaluation of the cost engineer.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method and system for dynamic management of whole-process cost of project
  • Method and system for dynamic management of whole-process cost of project
  • Method and system for dynamic management of whole-process cost of project

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0027] Example: see figure 1 , figure 1 It is a schematic flow chart of a whole-process cost dynamic management method provided by an embodiment of the present invention, and describes in detail a whole-process cost dynamic management method in the embodiment of the present invention from the cloud server 1 side. Such as figure 1 As shown, the method may include the following steps S101-S104.

[0028] Step S101: The cloud server 1 obtains the real-time update list and reads the cost list stored in the cloud server 1.

[0029] Specifically, both the update list and the cost list store project names and project prices. The data in the updated list is adjusted according to the actual land, equipment, technical labor and contracted prices.

[0030] Step S102: If it is judged that the update list and the cost list have the same item name, then the item prices in the cost list are updated.

[0031] Specifically, the item price is updated by replacing the item price in the cost ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

A method and system for dynamically managing the whole process cost of a project are disclose, The problem that the prices of the actual land, equipment, technical services and contracts are constantly changed, certain influence is generated on the budget and evaluation of the cost engineer. The technical proposal comprises the following points: the cloud server obtains a real-time update list and reads the cost list stored in the cloud server, wherein, the update list and the cost list store the project name and the project price; If it is judged that the updated list and the cost list havethe same project name, the project price of the cost list is updated; If the item price of the cost list is updated, the updated cost list is stored in the cloud server, so as to achieve the purpose of producing new budget and evaluation reports according to the changed land, equipment, technical services and contracted prices.

Description

technical field [0001] The invention relates to the technical field of engineering cost, in particular to a method and system for dynamic management of engineering cost throughout the entire process. Background technique [0002] The project cost refers to the project price, that is, the price of the construction and installation project and the total price of the construction project formed through bidding and other transactions in the market of land, equipment, technical labor and contracting after the completion of a project. [0003] However, the project cost needs multiple budgets and evaluations, and the actual land, equipment, technical labor services, and contract prices are constantly changing, which has a certain impact on the budget and evaluation of the cost engineer. Contents of the invention [0004] The object of the present invention is to provide a method and system for dynamic management of project cost in the whole process, which has the advantage of pro...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/06G06Q10/10G06Q50/08
CPCG06Q10/0631G06Q10/103G06Q50/08
Inventor 刘寰湘邓永维卢亮华谭超华
Owner 广东展诚工程咨询有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products