Rock mass classification method for TBM tunnel

A grading method and engineering rock mass grading standard technology, applied in the field of tunnel rock mass grading, can solve the problems of limiting TBM automatic and efficient excavation, shutdown inspection, time-consuming, labor-intensive accuracy and uniformity, etc.

Active Publication Date: 2019-05-07
YELLOW RIVER ENG CONSULTING
View PDF6 Cites 18 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

At present, the rock mass is mainly classified according to their own experience on the basis of the traditional drilling and blasting tunnel rock mass classification, which lacks scientific basis and requires repeated shutdown inspections, which is time-consuming and laborious, and the accuracy and uniformity are low, which greatly limits Automatic and efficient tunneling with TBM

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Rock mass classification method for TBM tunnel
  • Rock mass classification method for TBM tunnel
  • Rock mass classification method for TBM tunnel

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0063] Below in conjunction with embodiment the embodiment of the present invention is described in detail, present embodiment implements under the premise of the technical solution of the present invention, has provided detailed implementation and specific operation process, but protection scope of the present invention is not limited to the following Described embodiment.

[0064] The TBM tunnel rock mass classification method described in the present invention is based on the classification method in the "Engineering Rock Mass Classification Standard" (GB50218-2014), taking the basic quality index BQ of the rock mass as the criterion, and considering the hardness and integrity of the rock mass , while considering the combined relationship of groundwater, ground stress, orientation of the engineering axis and the occurrence of the main structural plane as the trimming factor to determine the rock mass quality of the surrounding rock; the specific steps are as follows:

[006...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a rock mass classification method for a TBM tunnel. The rock mass quality of surrounding rock mass is determined by taking a rock mass basic quality index BQ as a criterion under the consideration of rock mass hardness and rock mass integrity and the consideration of the combination relationship of groundwater, ground stress, engineering axis orientation and occurrence of main structural planes as dressing factors. The method comprises the following steps: 1, performing inversion formula calculation according to the relationships between uniaxial saturated compressive strength of rock mass and TBM equipment parameters, tunneling parameters and slag morphological parameters; and 2, performing calculation according to the relationship between a rock mass integrity coefficient and the TBM equipment parameters, tunneling parameters and slag morphological parameters. Based on the classification method of surrounding rock of underground engineering in the current Classification Standard for Engineering Rock Mass, parameters being difficult to obtain are avoided. The relationships between the easily obtained tunneling parameters as well as slag characteristics andthe indexes required for rock strength and integrity are determined according to the composite relationship between rock, machine and slag in the TBM construction process, thereby achieving the rapidsurrounding rock division of tunnel in TBM construction.

Description

technical field [0001] The invention relates to a method for grading tunnel rock mass, in particular to a method for grading TBM tunnel rock mass. Background technique [0002] During tunnel construction by TBM (abbreviation of Tunnel Boring Machine in English, tunnel boring machine), rock mass is often blocked or closed by huge equipment or lining segments, and it is difficult to directly observe and measure rock mass and classify rock mass using current regulations. At present, the rock mass is mainly classified according to their own experience on the basis of the traditional drilling and blasting tunnel rock mass classification, which lacks scientific basis and requires repeated shutdown inspections, which is time-consuming and laborious, and the accuracy and uniformity are low, which greatly limits TBM automatic and efficient excavation. Contents of the invention [0003] The purpose of the present invention is to provide a method for grading TBM tunnel rock mass. ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G01N33/24
Inventor 苗栋齐三红郭卫新杨继华杨风威姚阳张党立
Owner YELLOW RIVER ENG CONSULTING
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products