A virtual power plant optimal scheduling method based on a master-slave game strategy
Patent Information
- Authority / Receiving Office
- CN Β· China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- HEFEI UNIV OF TECH
- Publication Date
- 2019-06-18
- Estimated Expiration
- Not applicable Β· inactive patent
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention relates to the field of optimized operation of distributed power sources, and more specifically, the invention relates to an optimal scheduling method of a virtual power plant based on a master-slave game strategy. Background technique
[0002] In recent years, clean energy sources such as photovoltaic power plants and wind power plants have developed rapidly in China. Due to the uncertainty of distributed energy output, the connection of large-scale distributed energy to the distribution network will aggravate the peak-to-valley load difference of the power grid, and its safe operation caused a certain impact. On the other hand, with the rapid growth of electric vehicles, the load type of the power grid is no longer a single traditional load, but also a controllable load with temporal and spatial uncertainties. As a new type of energy management system, virtual power plant technology is more and more applied to the coordinated managemen...