A technology for cranes and control hooks, which is applied in the directions of cranes, load hanging components, transportation and packaging, etc., which can solve problems such as the hook hitting the top, the height of the hook cannot be easily estimated, safety accidents, etc., and achieve the goal of improving the level of automatic control Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0068] Such as figure 1 , figure 2 and image 3 As shown, the present invention provides a method for controlling the hook height during the luffing process of a crane, which includes the following steps:
[0069] S1 . Obtain the length of the jib 13 , the distance from the hinge point 132 of the jib to the reel stand 14 , and the height of the reel stand 14 .
[0070] S2. Obtain the first angle of the jib 13 before the crane 1 luffs, and calculate the variable through the first angle, the length of the jib 13, the distance from the jib hinge point 132 to the drum column 14, and the height of the drum column 14. The first length of the front hook wire rope 111.
[0071] S3. Obtain the second angle of the jib 13 after the crane 1 is luffed, and calculate the variable by the second angle, the length of the jib 13, the distance from the jib hinge point 132 to the reel column 14, and the height of the reel column 14. The second length of the hook wire rope 111 after the width...
Embodiment 2
[0090] Such as figure 1 , figure 2 and Figure 6 As shown, the present invention also provides a method for controlling the height of the hook during the luffing process of the crane, which includes the following steps:
[0091] S10. Under the condition that the suspension hook 15 of the crane 1 is fully loaded in advance, measure the height of the suspension hook 15 corresponding to the boom 13 at all angles; Corresponding hook 15 heights during all angles.
[0092] S20. Obtain the current load weight of the crane 1 .
[0093] S30 , acquiring the length of the boom 13 , the distance from the hinge point 132 of the boom to the reel stand 14 , and the height of the reel stand 14 .
[0094] S40. Obtain the first angle of the jib 13 before the crane 1 luffs, and calculate the variable through the first angle, the length of the jib 13, the distance from the jib hinge point 132 to the reel column 14, and the height of the reel column 14. The first length of the front hook wir...