Civil engineering project on-site management BIM system

A technology of civil engineering and on-site management, applied in the field of management systems, can solve problems such as unfavorable coordination and communication, construction errors, and increased construction costs, and achieve the effects of saving manpower and time, easy storage, and convenient operation and maintenance

Pending Publication Date: 2019-10-01
裴涛
View PDF4 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] (1) The two-dimensional design drawings of each major are relatively independent, which is not conducive to coordination and communication, often leading to collision problems, rework and delays, which affect the construction progress and increase construction costs;
[0004] (2) With the continuous development of the construction industry, the scale of construction projects is increasing day by day, the flow of funds is increasing, and the situation of construction subcontracting is complicated. Due to the disadvantages of traditional construction methods, the construction project department is out of touch with the construction site, and the progress of construction projects is not guaranteed. , The decline in cost control, the formation of isolated islands of information among the various participants, the inability to transmit and share information in a timely manner, frequent construction errors, affecting the project schedule and quality
[0006] However, in the prior art, there ar...

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Civil engineering project on-site management BIM system
  • Civil engineering project on-site management BIM system
  • Civil engineering project on-site management BIM system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0032] The BIM system for on-site management of civil engineering projects in this embodiment is based on the BIM engineering information management platform, and applies the Kanban management mode in the construction process management to carry out construction information sharing of the entire construction process and information transmission between various construction procedures.

[0033] Through the research on kanban management in the manufacturing industry and the application of kanban management in the manufacturing industry, it is found that: when BIM digital kanban is applied to construction management, it is far from enough to simply classify the construction kanban. Digital kanban is used in construction management for theoretical research. The core idea of ​​information system integration theory - data integration and information flow can provide theoretical support for the application of BIM digital kanban, carry out information transmission and feedback on the p...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides a civil engineering project on-site management BIM system, and the system comprises a BIM data source which is used for collecting a variety of data from a civil engineering project site; a data processing module which is used for carrying out data processing and data fusion on the BIM data source; a management platform which is used for integrating engineering data and exchanging and sharing information; an application module which is used for receiving management data of the management platform to guide construction and transmitting the related data in the constructionprocess to the management platform to form shared information. The data of the BIM data source is subjected to information extraction through the data processing module to form building component information and progress and cost information; the information is stored in the data processing module and is fused to form BIM data information; the management platform is divided into an engineering data integration platform and an information exchange and sharing platform and can receive the BIM data information, and the application module adopts a BIM digital billboard and carries out type distinguishing and hierarchical processing according to a construction management WBS structure decomposition method.

Description

technical field [0001] The invention relates to the technical field of management systems, in particular to a BIM system for on-site management of civil engineering projects. Background technique [0002] With the rapid development of my country's economy and science and technology, the demand for urban civil engineering has reached unprecedented heights, and the construction industry has also ushered in further breakthroughs and development. Among the traditional civil engineering construction teams in my country, due to the relatively low level of education, most of their management models are extensive, and the traditional production funding and operation management models are still used. The production efficiency is low and the waste is serious. Questions include: [0003] (1) The two-dimensional design drawings of each major are relatively independent, which is not conducive to coordination and communication, often leading to collision problems, rework and delays, which...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06Q10/06G06Q50/08G06F17/50
CPCG06Q10/0631G06Q50/08G06F30/13
Inventor 裴涛刘晶晶杨智康李晨光郭恒彦
Owner 裴涛
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products