The invention discloses an intensive
bus duct phase
sequence optimization arrangement calculation method, which comprises the following steps of: firstly, determining a
bus duct model and all phase sequence arrangement
modes thereof, and establishing a
bus duct geometric model by utilizing
modeling software; secondly, importing the model into electromagnetic transient
simulation software, establishing a three-dimensional
electromagnetic model of the intensive bus duct in
modes of excitation application, grid division and the like, and solving and extracting the electrodynamic force of each
phase line; a phase sequence arrangement sequence is given according to the size sequence of the electrodynamic force, a curve that the electrodynamic force changes along with the phase sequence is drawn, and a change trend is obtained by fitting an equation; and finally, giving out bus duct phase sequence arrangement suggestions according to a calculation result in combination with
engineering practice. According to the method, the characteristics of flexible
simulation setting, low cost and high working efficiency are fully utilized, the electrodynamic force values of the bus duct in different phase sequence arrangement
modes can be accurately obtained, the optimal phase sequence arrangement mode of the bus duct is provided, and data and method support is provided for
theoretical research, design, construction and operation and maintenance of the intensive bus duct.