Unlock instant, AI-driven research and patent intelligence for your innovation.

A method for realizing high-precision clock carried by gpon network

A technology of high-precision clock and implementation method, applied in time division multiplexing systems, electrical components, multiplexing communications, etc., can solve the problems of maintenance difficulties, system networking costs, installation and maintenance difficulties, and high costs. The effect of ensuring high-precision synchronization, avoiding system networking costs and difficulties in installation and maintenance

Active Publication Date: 2021-05-25
广东邮电职业技术学院
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

If each base station is equipped with a GPS receiver, the cost is high and maintenance is difficult; the installation of the GPS receiving antenna must meet the 120-degree clearance requirement, which also brings difficulties to the installation and construction; in addition, GPS resources are controlled by others, and there are hidden dangers in the use of resources
[0003] In order to solve the above problems, the present invention provides a method for implementing a GPON network carrying a high-precision clock, realizing a high-precision time synchronization scheme for base station backhaul, and avoiding system networking costs and installation and maintenance difficulties brought about by GPS mode

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A method for realizing high-precision clock carried by gpon network
  • A method for realizing high-precision clock carried by gpon network
  • A method for realizing high-precision clock carried by gpon network

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0046] Preferred embodiments of the present invention will be described in detail below in conjunction with the accompanying drawings.

[0047] as attached Figure 1-2 Shown, a kind of GPON network bears the realization method of high precision clock, comprises the following steps:

[0048] Define the optical line terminal OLT and optical network unit ONU as 1588V2 boundary clock BC;

[0049] The OLT synchronizes with the upstream network element through the Slave port, and distributes time to the ONU device through the Master port;

[0050] The ONU receives the time signal transmitted by the OLT through the Slave port, and sends the time to the base station through the Master port;

[0051] The GEM frame is used to transparently carry the 1588V2 PTP protocol between the OLT and the ONU.

[0052] The present invention provides a method for using GPON network to carry a high-precision clock, so that base station synchronization can reach tens of ns-level time synchronization...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a method for realizing a GPON network carrying a high-precision clock, comprising the following steps: defining an optical line terminal OLT and an optical network unit ONU as a 1588V2 boundary clock BC; The equipment distributes the time; the ONU receives the time signal transmitted by the OLT through the Slave port, and sends the time to the base station through the Master port; the GEM frame is used to transparently carry the 1588V2 PTP protocol between the OLT and the ONU. The present invention provides a method for using GPON network to carry a high-precision clock, so that base station synchronization can reach tens of ns-level time synchronization; and using synchronous GEM frames to transmit PTP messages ensures the high precision of the GPON network transmission process from the mechanism Synchronization, while avoiding the cost of system networking and the difficulty of installation and maintenance brought about by GPS mode.

Description

technical field [0001] The invention relates to the field of high-precision clocks, in particular to a method for implementing a GPON network carrying high-precision clocks. Background technique [0002] In traditional mobile applications, all time synchronization adopts the method of directly attaching GPS receiver to the base station, and the receiver receives the time information provided by GPS to realize the time synchronization of all base stations. If each base station is equipped with a GPS receiver, the cost is high and maintenance is difficult. The installation of the GPS receiving antenna must meet the 120-degree clearance requirement, which also brings difficulties to the installation and construction. In addition, GPS resources are controlled by others, and there are hidden dangers in the use of resources. [0003] In order to solve the above problems, the present invention provides a method for implementing a GPON network carrying a high-precision clock, realiz...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): H04J3/06H04J3/16
CPCH04J3/0667H04J3/1652
Inventor 蒋燕李兵韩玉琪
Owner 广东邮电职业技术学院