Construction method for changing mining method tunnel into shield method single shaft origination
A construction method, technology of the shield method, applied in tunnels, mining equipment, earthwork drilling and mining, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment approach
[0034] According to an embodiment of the present invention, preferably, the extended belt bracket 302 is welded and fixed to the original belt bracket 201 of the belt conveyor on the upper platform 2, which increases the overall stability and ensures During the construction process, the slag transportation was carried out smoothly.
[0035]Since the belt-driven equipment moves from the middle of the trolley to the tail of the elongated platform 3, the gravity of the belt-driven equipment is concentrated on the tail of the elongated platform 3, resulting in an unbalanced force on the shield trolley 1. In order to balance For the stress of the shield machine trolley 1, according to the technical solution of the present invention, a belt for balancing the shield machine is installed on the opposite ends of the extended belt bracket 302 and the original belt bracket 201 respectively. The force counterweight 4 of the trolley 1, the weight of the two force counterweights 4 is determ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com