Traffic tunnel surrounding rock cooperative control system and construction method thereof
A technology of collaborative control and surrounding rock, applied in tunnels, tunnel linings, earthwork drilling, etc., to prevent large deformation of surrounding rock
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 2
[0045] This embodiment discloses a construction method of a traffic tunnel surrounding rock collaborative control system. According to the large deformation parameters of the surrounding rock obtained in the previous period and the geological data obtained in the previous geological exploration, a numerical model is established through finite element software, and a reasonable maximum value is determined through numerical calculation. Optimal support parameters, including the diameter, length, row spacing, prestress size, rigid arch section size, arch spacing, longitudinal connection ring distance, etc. Energy layer, rigid guard plate layer, rigid arch and anchors. Construction includes the following specific steps:
[0046] Step 1: After the tunnel is excavated, use a pressure relief drilling rig to drill a hole 1 on the surface of the surrounding rock 9. After drilling, use a directional blasting device to blast the deep rock formation, which can effectively relieve the pres...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com