A construction method and buffer layer technology, applied in artificial islands, water conservancy projects, infrastructure projects, etc., can solve problems such as lengthening the construction period, destroying the stability of the side of the road, and increasing the risk of safety protection at operating points.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0040] A construction method for setting tension buffer layer to deal with old retaining wall, such as Figure 1-8 shown, including the following steps:
[0041]S1: Construction preparation: Familiarize yourself with the site conditions, measure and confirm the position and geometric dimensions of the old retaining wall 1, the proposed new demolition surface 1-1, and the elevation, measure and locate the location and elevation of the new road subgrade 5, and on site, be clearly identified;
[0042] S2: Pre-backfilling of the widened road section: delineate the construction area 3 of the widened road section, and carry out pre-backfilling according to the requirements of the design drawings and the relevant provisions of the construction specification;
[0043] S3: Destroy the top wall: use mechanical equipment to destroy the old retaining wall 1 wall from top to bottom, expand and excavate the earthwork until the set elevation, and form a new demolished surface 1-1;
[0044]...
Embodiment 2
[0057] A construction method for setting tension buffer layer to deal with old retaining wall, such as Figure 1-8 shown, including the following steps:
[0058] S1: Construction preparation: Familiarize yourself with the site conditions, measure and confirm the position and geometric dimensions of the old retaining wall 1, the proposed new demolition surface 1-1, and the elevation, measure and locate the location and elevation of the new road subgrade 5, and on site, be clearly identified;
[0059] S2: Pre-backfilling of the widened road section: delineate the construction area 3 of the widened road section, and carry out pre-backfilling according to the requirements of the design drawings and the relevant provisions of the construction specification;
[0060] S3: Destroy the top wall: use mechanical equipment to destroy the old retaining wall 1 wall from top to bottom, expand and excavate the earthwork until the set elevation, and form a new demolished surface 1-1;
[0061...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com