PC structure grouting sleeve connection construction method

A grouting sleeve and construction method technology, which is applied to structural elements, building components, building structures, etc., can solve the problems of lack of on-site construction quality control regulations and specifications, and the on-site connection quality is difficult to meet the design requirements, and achieves convenient construction and installation. Simple and effective to ensure connection strength

Inactive Publication Date: 2021-06-22
浙江宝嵘建设股份有限公司
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, at present, there are few researches on the construction technology of the on-site connection of prefabricated building structures at home and abroad, and the lack of strict on-site construction quality control procedures and specifications makes it difficult for the on-site connection quality to meet the design requirements.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • PC structure grouting sleeve connection construction method
  • PC structure grouting sleeve connection construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0022] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the drawings in the embodiments of the present invention.

[0023] refer to Figure 1-2 , PC structure grouting sleeve connection construction method, including the following steps:

[0024] In the present invention, the preparation of the connection part; S1. Before construction, the connection part needs to be prepared at first, and the specific steps are to clean the base layer of the structure to make it reach a clean state; measure the boundary line and control line of the control member; adjust the bolt Make its elevation the same as the design elevation at the bottom of the component.

[0025] Preferably, the sub-compartment and its surroundings are blocked before the hoisting; S1. Use the method of sub-compartment grouting, and control the length of the grouted single compartment within 150cm. When the width of the PC wallboar...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention belongs to the field of structural connection of fabricated buildings, particularly relates to a PC structure grouting sleeve connection construction method, and aims to solve the technical problems that the field connection quality is difficult to meet the design requirement due to less research on the existing field connection construction process of the fabricated building structure and lack of strict field construction quality control regulations and specifications. According to the scheme, one end of grouting sleeve connection is connected through sleeve grouting, when a component is hoisted, a ribbed steel bar reserved in a base layer needs to be inserted into a reserved sleeve of a PC component, then the position of the steel bar is adjusted through the modes of perpendicularity, elevation, positioning and the like, the component is temporarily fixed, after the strength of a grouting material meets the requirement, grouting material mixtures are injected through grouting holes, grouting is stopped when grout flows out of the grout outlets, and the grouting holes and the grout outlets are blocked. The basic materials of the grouting materials are cement, and the grouting materials also comprise an additive, fine aggregate and other materials, and a proper amount of water is added and stirred.

Description

technical field [0001] The invention relates to the technical field of structural connection of prefabricated buildings, in particular to a PC structure grouting sleeve connection construction method. Background technique [0002] In recent years, prefabricated buildings have developed rapidly during the current upgrading and transformation of the construction industry due to their advantages such as energy saving and environmental protection, low labor costs, and simple construction processes. One of the basic design concepts of prefabricated concrete structures is equivalent to cast-in-place, and the key to its realization lies in the interconnection between prefabricated components. [0003] According to the research results on the seismic performance and connection forms of prefabricated concrete structures at home and abroad, a reasonable connection method can improve the reliability of the connection quality of key nodes of the building structure, making the organic an...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E04C5/16E04G21/02
CPCE04C5/165E04G21/02
Inventor 王佳敏戴海娅
Owner 浙江宝嵘建设股份有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products