Electric power engineering fund prediction method and device

Pending Publication Date: 2021-09-03
STATE GRID HEBEI ELECTRIC POWER CO LTD +2
View PDF0 Cites 5 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] In view of the above analysis, the embodiment of the present invention aims to provide a method and device for forecasting power engineering funds to solve the problems of poor adaptability to different projects, heavy forecasting workload, and inaccurate forecasting results in existing methods

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Electric power engineering fund prediction method and device
  • Electric power engineering fund prediction method and device
  • Electric power engineering fund prediction method and device

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0032] Preferred embodiments of the present invention will be described in detail below in conjunction with the accompanying drawings, wherein the accompanying drawings constitute a part of the application and together with the embodiments of the present invention are used to explain the principle of the present invention and are not intended to limit the scope of the present invention.

[0033] A specific embodiment of the present invention discloses a method for predicting electric power engineering funds. refer to figure 1 , the power engineering fund prediction method includes: step S102, comprehensively analyzing multiple historical projects to determine the influencing factors of the power engineering fund budget, the influencing factors include project cycle, number of participants, material consumption and equipment consumption; step S104, collecting historical The influencing factors of the project and the corresponding power engineering funds, the power engineering f...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to an electric power engineering fund prediction method and device, belongs to the technical field of electric power engineering, and solves the problem of inaccurate prediction result in the prior art. The electric power engineering fund prediction method comprises the steps: comprehensively analyzing a plurality of historical projects to determine influence factors of electric power engineering fund budget, wherein the influence factors comprise project periods, the number of participants, material usage and equipment usage; collecting influence factors of historical projects and corresponding electric power engineering funds; performing normalization processing on the influence factors, and then dividing the normalized influence factors and the corresponding electric power engineering funds into two sets including a training set and a verification set; constructing a neural network model based on Bayesian formula optimization, and training and verifying the neural network model through the training set and the verification set to obtain a prediction model; and inputting the influence factors of the to-be-predicted project into the prediction model to obtain a fund prediction value. The accuracy of prediction results is improved.

Description

technical field [0001] The invention relates to the technical field of electric power engineering, in particular to a method and device for predicting electric power engineering funds. Background technique [0002] Power projects need to be budgeted before they are implemented, which is an indispensable part of the cost accounting of power companies. Accuracy is related to the financial security of the entire enterprise. Improving the accuracy of capital budget can reduce the capital risk of the enterprise. However, the current capital forecasting system adopted by my country's electric power enterprises generally does not consider the past budget items and income and expenditure levels. Specific projects are budgeted item by item from scratch. [0003] Since the above-mentioned existing systems need to use uncertain data and expert experience for calculation each time, they have poor adaptability to different projects, heavy forecasting workload, and will be affected by subj...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q50/06G06N3/04
CPCG06Q10/0631G06Q50/06G06N3/04
Inventor 袁翰青刘宏张雨菲宋晓华王静孙辰军郑超何瑞汪鹏董玉坤冯康进宋丹张婕何颖
Owner STATE GRID HEBEI ELECTRIC POWER CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products