Soft foundation building foundation structure and construction method
A foundation structure and soft foundation technology, applied in the field of soft foundation building foundation structure and construction, can solve the problems of easy settlement of foundation piles and building structures, high void ratio of soft foundation, high compressibility, etc., to increase structural strength, reduce The effect of small sinking and improving bearing capacity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0032] This embodiment provides a soft foundation building foundation structure, including a plurality of pipe piles 1, a rigid grouting pipe 2 is provided in the middle of the pipe piles 1, and a plurality of sleeves 3 are connected to the rigid grouting pipe 2 in the circumferential direction ; One end of the sleeve 3 communicates with the interior of the rigid grouting pipe 2, one end of the sleeve 3 is fixedly connected to the side wall of the pipe pile 1, and the sleeve 3 is inserted with a soil rod 4; A piston ring 5 is fixed outside the inner end of the soil insertion rod 4, and the soil insertion rod 4 and the piston ring 5 can move in the sleeve 3 in a direction away from the grouting pipe. The wall is provided with a plurality of grouting holes; the inserting rod 4 is fitted with a slidable guide rod 6, the inner end of the guide rod 6 is fixedly connected with the rigid grouting pipe 2, and the guide rod 6 is inserted The length provided in the soil-inserting rod 4 ...
Embodiment 2
[0045] This embodiment provides a construction method for a soft foundation building foundation structure, based on the construction of the soft foundation building foundation mechanism described in Example 1, comprising the following steps:
[0046] The components that make up the pipe pile 1 are assembled into the pipe pile 1 .
[0047] The steps of assembling pipe pile 1 include:
[0048] A plurality of first connection holes are drilled on the side wall of the pipe pile 1, the first connection holes are evenly distributed along the circumference of the side wall of the pipe pile 1, and the first connection holes are arranged at intervals along the length direction of the pipe pile 1. multi-turn;
[0049] Drilling second connecting holes with the same number as the first connecting holes at the position corresponding to the first connecting hole on the side wall of the rigid grouting pipe 2;
[0050] A threaded hole corresponding to the second connection hole is provided ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com