[0112] This embodiment adopts figure 2 The improved IEEE 33-node power distribution network topology is shown, in which nodes #1-13 and #19-28 form a microgrid①, nodes #14-18 form a microgrid②, and nodes #29-33 form a microgrid③ , the access of diesel engine, wind power, photovoltaic, energy storage power station and mobile energy storage at each node is as follows: figure 2 As shown, the access nodes of mobile energy storage in microgrid ①, microgrid ②, and microgrid ③ are node #28, node #18, and node #33, respectively. The emergency dispatch time period of the distribution network is set to be 4 hours, and the unit dispatch time is 10 minutes. The test scenario indicates that after a power outage accident occurs, the connection between the distribution network and the large power grid is interrupted, and the three microgrids that make up the distribution network enter the isolated grid operation state at the same time. In the embodiment, taking two mobile energy storage ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com