The invention discloses an
electric power infrastructure project
risk assessment method based on a multi-factor dynamic weighting
algorithm, and belongs to the technical field of
project management, and the method comprises the steps: carrying out the
noise filtering of original business flow data, and carrying out the normalization compression of a filtered
data field, and obtaining a standardized
data set; performing factor stripping on the standardized
data set to obtain an original
risk factor pedigree; performing weight assignment on the original
risk factor pedigree to obtain an initial weight assignment factor set; calling a weight correction
coefficient matrix in a preset benchmark item
database, and performing dynamic iteration calibration on the initial
weight value to obtain a stage weight vector; performing empowerment reconstruction on the initial empowerment factor set to obtain a risk
feature vector; performing fuzzy membership degree matching on the risk
feature vector to obtain an
evaluation conclusion; and carrying out standardized packaging on the assessment conclusion, the risk
feature vector and the stage weight vector to obtain a
risk assessment data message. According to the invention, the accuracy and efficiency of
risk assessment of the power infrastructure project can be improved.