Mixed fiber construction method for high-mode crumb series greening
A technology of mixed fibers and high-order clusters, applied in land preparation methods, infrastructure engineering, excavation, etc., can solve the problems of suspended particulate matter, water and ground loss, affecting aesthetics, etc., to beautify the environment, resist rain erosion and wind erosion, and prevent soil and water. drain effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0015] It includes the following steps:
[0016] The first step is to lay the metal mesh: after cleaning the pumice, dangerous stones and garbage and weeds on the slope, spread the wire mesh from the top to the bottom of the slope, hang it on the slope, and fix the top with the main anchor;
[0017] The second step is to set up anchors: anchors are the main anchors and secondary anchors, which are set according to the shape of the slope, so that the metal mesh can be firmly fixed on the slope. The amount of anchors used is per 100 square meters. 80 pieces, the amount of secondary anchors used is not less than 220 pieces per 100 square meters;
[0018] The third step is to add a base plate attachment platform for the nutrient base plate to be attached to the slope of the rock wall. The distance between the base plate attachment platforms of each column is adjusted according to the slope at 30-50cm, and the spraying thickness is designed according to the thickness of the base pl...
Embodiment 2
[0024] Include the following steps:
[0025] The first step is to lay the metal mesh: after cleaning the pumice, dangerous stones and garbage and weeds on the slope, spread the wire mesh from the top to the bottom of the slope, hang it on the slope, and fix the top with the main anchor;
[0026] The second step is to set up anchors: anchors are the main anchors and secondary anchors, which are set according to the shape of the slope, so that the metal mesh can be firmly fixed on the slope. The amount of anchors used is per 100 square meters. 90 pieces, the amount of secondary anchors used is not less than 260 pieces per 100 square meters;
[0027] The third step is to add a base plate attachment platform for the nutrient base plate to be attached to the slope of the rock wall. The distance between the base plate attachment platforms of each column is adjusted according to the slope at 30-50cm, and the spraying thickness is designed according to the thickness of the base plate ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com