Technique for building quick-speed consolidated platform near water by using clay under lake
A process method and technology of water platform, applied in infrastructure engineering, excavation, filling and other directions to achieve the effect of reducing investment
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0050] One of the five largest freshwater lakes in my country has serious problems such as insufficient flood control standards along the shoreline, serious lakeside collapse, intensified soil erosion, and deterioration of the ecological environment along the lake. It is urgent to carry out flood control and ecological restoration projects along the lakeside. Combined with the flood control and landscape requirements of the lakeside city, it is necessary to build waterfront anti-wave forests and landscape platforms along the shoreline of the lake. According to the relevant regulations of environmental protection, it is not allowed to take soil from the land to fill the water platform in the lake, only to take soil from the bottom of the lake.
[0051] After a large-scale geological survey, the bottom of the lake is clay, and no sandy soil that is easy to consolidate has been found. The platform built by sucking mud from the bottom of the lake by conventional flushing method can...
Embodiment 2
[0067] Located on the shoreline of the same lake in Example 1, it is necessary to build a river crossing memorial square extending into the lake for about 250m, and its foundation platform is 60,000m 2 , the filling volume is 400,000 m 3 Also adopt this inventive process to get the lake bottom clay filling. The foundation platform 1 has high requirements on the compaction degree of the filling earthwork. The separation cofferdam 5 is excavated by the waterway and poured soil into the nearby water and cannot be compacted in layers. The separation cofferdam 5 is arranged in the platform filling area as in the embodiment 1. Difficult to meet engineering requirements.
[0068] The specific construction layout is shown in Fig. 6, and the processes of excavating the waterway 2, taking soil from the lake bottom, transporting the soil, unloading the soil, and pushing and leveling the soil for leveling are all the same as in Embodiment 1, and the separation cofferdam 5 is arranged out...
PUM
Property | Measurement | Unit |
---|---|---|
depth | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com