Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

78results about How to "Consolidation fast" patented technology

High-performance sand-soil consolidation material, as well as preparation method and using method thereof

The invention relates to a high-performance sand-soil consolidation material, as well as a preparation method and a using method thereof. The high-performance sand-soil consolidation material belongs to a mortar composition and is characterized by comprising the following raw materials in parts by weight: 5-40 parts of cement clinker, 3-6 parts of gypsum, 4-10 parts of alkali additive, 0.5-6 parts of compound activating agent, 1-4 parts of early strength agent, 2-10 parts of mineral activating agent, 3-8 parts of expansion agent and 22-77 parts of micro-powder formed by fine grinding of blast furnace water-quenched slag. The invention provides the high-performance sand-soil consolidation material which has the advantages of simple operation, convenient construction, good water resistance, fast consolidation, high early strength, stable improvement of post-strength, resistance to erosion of underground inorganic salt water, excellent anti-seepage performance and low production cost, as well as the preparation method and the using method thereof. The high-performance sand-soil consolidation material is suitable for consolidating mine tailings, natural weathered sand, fly ash, gravel, stone chips, stone powder, soil, sludge, construction waste, coal gangue and phosphorus slag into a solid material, and can be used for laying a subgrade, constructing a wall body and constructing a site foundation.
Owner:淄博乾耀固结材料有限公司

Double-layer low-position vacuum preload consolidation device and soft soil foundation reinforcing method

InactiveCN101413261AImprove bearing capacitySolve the difficult problem of occupying landSoil preservationSludgeEngineering
The invention provides a double-layer low level vacuum preloading consolidation device and a soft soil foundation consolidation method. The device consists of a main controller, a power distribution controller, a vacuum pump, a submersible pump, a buffer knockout drum, a control valve, a vacuum gauge, a vacuum degree detecting head, a hydraulic fill consolidation layer vacuum pipe network, a soft soil consolidation layer vacuum pipe network, a subsidence mark, an open water overflow port, pipes and gauge tables, wherein a cofferdam is reclaimed along the consolidation area border in the soft soil foundation, a soft soil consolidation layer is formed in the cofferdam, the soft soil consolidation layer is provided with the soft soil consolidation layer vacuum pipe network and a hydraulic fill consolidation layer, the hydraulic fill consolidation layer is provided with a bearing separation layer and the hydraulic fill consolidation layer vacuum pipe network, and the hydraulic fill consolidation layer vacuum pipe network is hydraulically filled with a sealing layer. The invention has the advantages of reasonable structure, convenient construction, short construction period, low cost, good consolidation effect, facilitation of construction in large areas, consolidation of the soft soil foundation, dredging, and reutilization of the dredged sludge after consolidation, and can solve the problem of difficult land occupation of a blow-off field and create economic benefits.
Owner:TIANJIN WATER RESOURCES RES INST

Rigid drainage pile and construction method thereof

The invention discloses a rigid drainage pile and a construction method thereof. A precast watertight concrete tube and a precast water permeating concrete tube are respectively provided with a vertical first through hole and a vertical second through hole, wherein the first through hole and the second through hole are hermetically communicated; and the second through holes on adjacent precast water permeating concrete tubes are hermetically communicated with each other. As the second through holes on the water permeating concrete tube can filter underground water, form a vertical draining channel for pore water in a soil layer, can quickly scatter pressure of the pore water rapidly increased in the soil layer to lead the ground to be hard to be upheaved; the rigid drainage pile forms negative pressure through a vacuum pump and a suction pipe to pump underground water and generate vacuum, can quickly and forcibly reduce water content of the soft soil layer among piles and form effective stress in the stratum so as to form prepressing on the foundation and improve the strength of foundation soil; when the water content of the soil layer is reduced to be suitable for tamping, a pounder is used for tamping the ground surface to ensure that the soil layer of the foundation can be quickly consolidated, and the strength is quickly improved. The consolidated composite foundation has higher bearing capacity, but the cost for treating the foundation is lower.
Owner:梁钰泽

Method for processing ultra-soft soil through combining shallow-surface-layer intermittent strong water-pumping/draining with short-term air-curing

The invention discloses a method for processing ultra-soft soil through combining shallow-surface-layer intermittent strong water-pumping/draining with short-term air-curing. The method comprises the following steps of: arranging horizontal water-pumping/draining pipe networks in a shallow-surface layer of an ultra-soft soil body, arranging water-draining pipe trenches in the surface layer and connecting the horizontal water-pumping/draining pipe networks and the water-draining pipe trenches with water-pumping/draining equipment so as to form a three-dimensional surface-layer water-pumping/draining system for shallow-surface-layer ultra-soft soil; carrying out intermittent strong water-pumping/draining and being aided with surface-layer drainage by using the water-pumping/draining equipment; and meanwhile, combining with the short-term air-curing by using the climate characteristics of strong sunlight and strong wind of coastal areas. According to the invention, the reinforcement for the shallow-surface-layer ultra-soft soil can be effectively and rapidly achieved, thus the invention provides a reinforcement treatment method which is applied to ultra-soft foundations, the shallow-surface layer of which is made of sludge or hydraulic-filled sludge and can greatly save cost.
Owner:CCCC FOURTH HARBOR ENG INST +3

Waterpower self-excited oscillation jet flow vibratory pile sinking device and pile sinking technology

The invention relates to a waterpower self-excited oscillation jet flow vibratory pile sinking device and a pile sinking technology. A reinforced concrete pile body is a sheet pile, a square pile head and a hanging ring are arranged in the middle of the top of the reinforced concrete pile body, the reinforced concrete pile body is connected with a vibratory hammer part through a vibratory hammer connecting device, a jet flow pipe with a self-excited oscillation jet flow nozzle is arranged on the bottom of the sheet pile, the jet flow pipe is connected with a high pressure water pump group through a water pipe and rapid docking movable elbows, and the vibratory hammer part is connected with lifting equipment through an integrated lifting appliance. The waterpower self-excited oscillation jet flow vibratory pile sinking device and the pile sinking technology have the advantages that construction technologies of different strata can be resolved, construction efficiency can be improved greatly at the same time, construction quality is guaranteed, drawbacks and defects exist in the prior art are overcome or avoided, the problems of hard clay strata pile sinking speed and breakdown of underground obstacles are resolved, the purpose that undisturbed soil on two 2-meter-long sides of the bottom of the pile body in a pile sinking process is not damaged is achieved, the two sides of the pile body are filled with sand to enable disturbed soil on the two sides of the pile body to be replaced by silver sand, and fast consolidation is achieved.
Owner:东营石大海琛石化科技有限公司 +4

Negative-pressure three-dimensional flow-guiding disturbance impact solidification dredger filling method

The invention discloses a negative-pressure three-dimensional flow-guiding disturbance impact solidification dredger filling method. The negative-pressure three-dimensional flow-guiding disturbance impact solidification dredger filling method mainly comprises the steps that a dredger fill area is cleaned and flattened; a ditch is horizontally formed in the dredger area or a horizontal water seepage pipe is arranged by inclining by 0.5-5 degrees, and backfilling is conducted through medium and rough sand-gravel aggregate; a dam and a drainage canal are constructed on the periphery of the dredger fill area, and a water diversion pipe and an automatic-flowing drainage pipe are pre-buried; a dredger fill pipeline is led into the dredger fill area in the dam; slurry is guided into the surface layer of the dredger fill area and underground water is guided into the drainage canal after silt deposits; a water suction pump is connected to the outer port of the drainage pipe, and then forced drainage is conducted. Meanwhile, the invention creatively provides a suspension controllable dredger fill area drainage device, a movable multifunctional integrated well tube draining and vibrating-flushing device and technologies matched with the suspension controllable dredger fill area drainage device and the movable multifunctional integrated well tube draining and vibrating-flushing device. Compared with the prior art, the reinforcing period can be shorted by about 50% and the comprehensive unit cost can be reduced by about 45% under the same condition, and the bearing capacity of a fill stratum within the overall depth range can reach 60-80 kPa after treatment.
Owner:江苏楚匠建设工程有限公司

Treatment structure and method of high-strength water-permeable fiber concrete pipe gravel core pile soft thick soil base

The invention discloses a treatment structure of a high-strength water-permeable fiber concrete pipe gravel core pile soft thick soil base. The treatment structure of the soft base comprises high-strength water-permeable fiber concrete pipe piles, gravel, soft water-permeable blind pipes, water-permeable concrete pile followers, gravel cushion layers and two-way steel-plastic gratings. The high-strength water-permeable fiber concrete pipe piles are filled with the gravel, the soft water-permeable blind pipes are arranged in the high-strength water-permeable fiber concrete pipe piles, the water-permeable concrete pile followers are arranged at the upper ends of the high-strength water-permeable fiber concrete pipe piles, the gravel cushion layers are arranged above and around the water-permeable concrete pile followers, the two-way steel-plastic gratings are arranged on the middle portions and the upper portions of the gravel cushion layers, and the position on the two-way steel-plasticgrating on the uppermost layer is filled with roadbed soil and a roadbed. By means of the novel application and the novel process of a novel material, the soft soil base can be effectively treated athigh quality, the method is simple, the effect is excellent, the bearing force of the soil base is greatly improved, the construction period is greatly shortened, the engineering cost is reduced, andhigh economic benefits are increased.
Owner:JIANGSU JIAOTONG COLLEGE +1

Industrially-manufactured dam component and method for quickly building dams

InactiveCN103938581AOvercome the stack can't go upTo overcome the slow increase in the degree of consolidationDamsClimate change adaptationVacuum pumpingLandslide
The invention provides an industrially-manufactured dam component and a method for quickly building dams, and belongs to the technology of dam building. The method comprises the steps that a foundation is quickly processed by the means of a plastic water drainage plate, geofabric, a sand cushion laye, a vacuum pumping combined pre-pressing means and the like; the mode that vacuum pumping is conducted under a sealing film is used, a secondary sand cushion layer is poured on a covered thin film, and an earthwork is input on a prefabricated part; combined prepressing of the water level, sand cushion layer earthwork heaping and vacuum pumping is formed; the method that a prefabricated dam component is built on a processed embankment foundation, the prefabricated dam component and the processed embankment foundation are connected with each other to form a dam framework, and a light cushion layer is laid is used. The stress balance of the dam is adjusted, and differential settlement and landslide are avoided. The problems of foundation strength and earthwork heaping are fundamentally solved, and mechanical and mass construction is facilitated. The advantages of saving cost due to the fact that stones are replaced by earth, increasing the construction speed, being stable and reliable and the like are achieved.
Owner:ZHEJIANG UNIVERSITY OF SCIENCE AND TECHNOLOGY

Prepressing structure and method used for sea reclamation through blown filled muck

ActiveCN106120701AImprove drainage efficiencyGood foundation bearing capacitySoil preservationLand reclamationEngineering
The invention discloses a prepressing structure used for sea reclamation through blown filled muck. The blown filled muck is located in an original foundation and includes vertical water draining bodies arranged in the blown filled muck, a water falling pipe parallel to the vertical water draining bodies, and a bottom sand layer arranged at the bottom of the blown filled muck. The water falling pipe is of a hollow structure, an upper section of the water falling pipe is arranged to be a non-porous section, and a lower section of the water falling pipe is arranged to be a porous section. The porous section is located in the original foundation and the bottom sand layer. A water suction pump and a water pumping pipe are arranged in the water falling pipe. The water suction pump is located at the bottom of the porous section. The input end of the water pumping pipe is connected with the water suction pump, and the output end of the water pumping pipe extends to the top of the water falling pipe. A vacuum pipe layer is arranged on the tops of the vertical water draining bodies and the top of the water falling pipe in a communicating manner, and a vacuum film is arranged on the vacuum pipe layer. The vacuum pipe layer is connected with a vacuum pump. The invention further discloses a method used for sea reclamation through the blown filled muck. By means of the prepressing structure and the method, a vacuum water falling and prepressing combining effect can be achieved, a water draining effect is better, a foundation solidifying effect is better, and the bearing force is higher.
Owner:HOHAI UNIV

Technique for building quick-speed consolidated platform near water by using clay under lake

The invention relates to a process method for constructing a fast consolidated waterside platform by using clay from the bottom of a lake. The method does not use the conventional filling method for construction, but takes entire blocks of clay from the bottom of the lake and transports the clay to a lakeside for embanking, and comprises the following steps: channel excavation, breakwater construction, clay taking from the bottom of the lake, clay material transportation, clay unloading, clay pushing transportation and leveling, and ship channel backfilling. The waterside platform is a platform along the lake shoreline and can be designed into various shapes according to requirements, wherein the width is between 10 and 300 meters, the water depth at the waterside platform is between 1 and 3 meters, and the crest level of the platform is at least 0.5 meter higher than the normal water level. The method can use conventional barges of an internal lake to transport block stones to a filling surface through a ship channel directly, and adopt mechanical dumping to reduce labor intensity and shorten construction period; and the method can achieve the aim of constructing the waterside platform on the lake shoreline, which can consolidate fast and satisfy the requirements of lakeshore stability and bearing after the filling construction through taking the clay from the bottom of the lake. The method can reduce 30 to 50 percent of the investment compared with taking the clay from land to fill the platform, and can reduce two thirds to three fourths of the investment compared with sucking the clay from the bottom of the lake and then performing a secondary consolidation.
Owner:ANHUI SURVEY & DESIGN INST OF WATER CONSERVANCY & HYDROPOWER

Environment-friendly mud discharge field sludge rapid consolidation system and consolidation method thereof

PendingCN111155541AConsolidation fastShorten drainage consolidation timeSoil preservationSludgeProcess engineering
The invention discloses an environment-friendly mud discharge field sludge rapid consolidation system and a consolidation method thereof . The specific working principle of the consolidation method for using the environment-friendly mud discharge field sludge rapid consolidation system comprises the following steps that grouting floral pipes of an external binding mold bag is implanted into a muddischarge field foundation, vertical drainage pipes are implanted around the grouting floral pipes, and the elevation of the grouting floral pipes and drain pipe hole openings is higher than the elevation of the sludge stacking surface; after sludge is discharged and completed, the sludge slurry is sequentially poured from the grouting floral pipes of boundary rows according to sequence, the perfusion pressure is increased step by step, the mold bag slowly expands to a designed diameter, and the sludge is extruded radially; the slurry in the mold bag is quickly consolidated under the action ofpressure, the free water of the slurry in the mold bag and the super-static pore water generated by extrusion of the sludge are discharged from an earth ground together through the vertical drainagepipes, and the free water and the super-static pore water are gathered into horizontal drainage pipes to be discharged out of the field to achieve rapid consolidation. The method overcomes the problems that a traditional sludge consolidation method is long in consolidation time, complex in process, high in auxiliary measure requirement, difficult in subsequent cleaning work, poor in economy, poorin environmental protection property and the like, and has the characteristics of short consolidation time, high environmental friendliness, simple equipment and process and low construction cost.
Owner:CHINA INST OF WATER RESOURCES & HYDROPOWER RES +2

Damming method through seepage draining prism bodies realizing bidirectional permeation and reverse laying

ActiveCN110670546AReduced dam building costsRealize two-way penetration functionEmbankmentsEarth-fill damsSoil scienceStructural engineering
The invention discloses a damming method through seepage draining prism bodies realizing bidirectional permeation and reverse laying. The method comprises the following steps that flexible water permeable cylinders are laid into a dam along a natural slope of a dry beach; water guide pipes and joints are laid from the outside of the dam into a tailing pond along the lower portions of the longitudinal flexible water permeable cylinders to form water guide systems; seepage draining pipes are penetrated into the water permeable cylinders and are connected with the water guide systems; tailing sand is injected into the water permeable cylinders, and the longitudinal flexible water permeable cylinders form longitudinal seepage draining prism bodies; a transverse flexible water permeable cylinder is laid in parallel along a fill dam; a seepage drainage pipe is penetrated into the transverse flexible water permeable cylinder, and the outlet of the seepage drainage pipe is connected with the seepage draining pipes of the longitudinal prism bodies; tailing sand is injected into the transverse flexible water permeable cylinder, fine tailings and water in the tailing sand flow into the seepage draining pipes of the longitudinal seepage draining prism bodies through the internal seepage drainage pipe to be discharged, and the transverse flexible water permeable cylinder forms a transverseseepage drainage prism body as a tailing pond water permeable fill dam; and the space between the adjacent longitudinal prism bodies is filled with the tailing sand to form the dry beach. The method is simple in construction, good in stability, high in strength, rapid in damming and low in cost.
Owner:吉林省华冶环境治理有限公司

Pipe periphery backfilling material suitable for flexible pipeline and preparation method and backfilling method of pipe periphery backfilling material

The invention discloses a pipe periphery backfilling material suitable for a flexible pipeline and a preparation method and a backfilling method of the pipe periphery backfilling material. The pipe periphery backfilling material comprises the following components: 12 wt%-17 wt% of water, 1.2 wt%-1.5 wt% of cement, 14 wt%-19 wt% of fly ash, 53 wt%-57 wt% of fine sand, 6.2 wt%-7.6 wt% of stone powder, 0.4 wt%-0.6 wt% of a setting accelerator and 0.2 wt%-0.7 wt% of a water reducing agent. According to the pipe periphery backfilling material suitable for the flexible pipeline and the preparation method and the backfilling method of the pipe periphery backfilling material, the material does not need layered compaction in the backfilling process, it can be guaranteed that backfilling is dense at the haunch corner of the flexible pipeline, the stability of the overall structure of a flexible drainage pipe under a heavy-load pavement is guaranteed, the problems of pavement collapse, cracking and the like can be solved, the backfilling operation efficiency of the flexible drainage pipe is improved, and the backfilling cost is reduced. The preparation method and the backfilling method are simple and convenient to use.
Owner:SHANGHAI URBAN CONSTR MATERIAL CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products